Somaya Solar Solutions Limited builds ground-mounted solar power plants in Diu, Dadra and Nagar Haveli and Daman and Diu for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Diu
A solar plant in Diu is modelled to produce about 1,540 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (25°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 15.4 lakh units | 4 to 5 acres |
| 2 MW | 30.8 lakh units | 8 to 10 acres |
| 5 MW | 77.0 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Dadra and Nagar Haveli and Daman and Diu
JERC brought green energy open access into its Connectivity and Open Access Regulations, 2017 through the Third Amendment of 2024, published in the Gazette of India on 19 September 2024. A consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the same electricity division.
The charges, exemptions and conditions for Dadra and Nagar Haveli and Daman and Diu are on the page Ground-Mounted Solar Plant in Dadra and Nagar Haveli and Daman and Diu.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Diu
These are the Somaya Solar projects closest to Diu, with straight-line distances. They are shown as references and are not in Diu unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1030 km from Diu. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1180 km from Diu. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Diu
Which electricity company handles solar connections in Diu?
Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Diu, which the cited source places in its supply area.
How much electricity does a solar plant generate in Diu?
About 1,540 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.4 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Diu?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1100 km from Diu in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1030 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Diu
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DNHDDPDCL: source naming Diu within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- JERC (Connectivity and Open Access in Intra-State Transmission and Distribution) (Third Amendment) Regulations, 2024 (No. JERC-21/2017, notified 13 August 2024, Gazette of India 19 September 2024), and JERC Tariff Order for DNH and DD Power Distribution Corporation Limited of 25 September 2025
- PVGIS, European Commission Joint Research Centre (solar output model)