Somaya Solar Solutions Limited delivers turnkey solar projects in Diu, Dadra and Nagar Haveli and Daman and Diu: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Diu

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (DNHDDPDCL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Diu

In Dadra and Nagar Haveli and Daman and Diu, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

The size limits, charges and other conditions for Dadra and Nagar Haveli and Daman and Diu are on the page Turnkey Solar EPC in Dadra and Nagar Haveli and Daman and Diu.

In Diu the application for connection and metering goes to DNHDDPDCL.

What to expect from the plant in Diu

A solar plant in Diu is modelled to produce about 1,500 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹4.80 per kVAh (JERC Tariff Order of 25 September 2025 for DNH and DD Power Distribution Corporation Limited (Petition No. 145 of 2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹4.80 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹455 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. A tariff surcharge of 8.77% applies from 1 July 2026 to 31 March 2027 (the 5.00% approved in September 2025 plus 3.77% approved in the JERC true-up order of 16 June 2026). Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge in solar hours and 1.2 times in peak hours. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹4.70 per kVAh with a fixed charge of ₹580 per kVA per month. DNHDDPDCL is the only licensee.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.80 per kVAh
100 kW1.5 lakh units1,000 sq m₹7.2 lakh
500 kW7.5 lakh units5,000 sq m₹36.0 lakh
1 MW15.0 lakh units10,000 sq m₹72.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Diu

These are the Somaya Solar projects closest to Diu, with straight-line distances. They are shown as references and are not in Diu unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1030 km from Diu. Completed, including the transmission line work coordinated with the local distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1180 km from Diu. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1200 km from Diu. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.

See all published projects

Questions about solar projects in Diu

Which electricity company handles solar connections in Diu?

Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Diu, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Diu?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Dadra and Nagar Haveli and Daman and Diu.

How much electricity does a solar plant generate in Diu?

About 1,500 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Diu?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1100 km from Diu in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1030 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Diu

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition