Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Dondaicha, Maharashtra. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Dondaicha
The Government of India's One District One Product (ODOP) list names De-Oiled Cake and Textile as the products of Dhule district.
Metering rules for business rooftops in Dondaicha
In Maharashtra, consumers of every category, including commercial and industrial, can install a rooftop or on-premises renewable system under net metering, net billing or gross metering. Under net metering the system may be up to 5 MW or the consumer's contract demand or sanctioned load, whichever is lower. Under the other arrangements it may be up to the contract demand or sanctioned load. The rules are in MERC's Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019, as amended in November 2023 and August 2024.
The size limits, charges and other conditions for Maharashtra are on the page Commercial & Industrial Solar in Maharashtra.
In Dondaicha the application for connection and metering goes to MSEDCL.
Output and bill value for a rooftop plant in Dondaicha
A solar plant in Dondaicha is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the MSEDCL HT I (A): HT - Industry energy charge of ₹8.44 per kVAh (MERC order of 25 March 2026 in Case No. 75 of 2025 (review of MSEDCL's MYT order of 28 March 2025), rates for 2026-27 in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is MSEDCL's energy charge for 2026-27. HT consumers (11 kV to 33 kV) also pay a wheeling charge of ₹0.81 per kVAh, for a total of ₹9.25. EHV consumers (66 kV and above) pay no wheeling charge. A demand charge of ₹650 per kVA per month also applies. Time of day: energy used from 9 AM to 5 PM gets a rebate of 15% of the energy charge from April to September and 25% from October to March. Energy used from 5 PM to midnight costs 20% more. The tariffs exclude electricity duty and taxes. Mumbai licensees have their own MERC orders of 28 March 2025 with lower 2026-27 rates for HT I industry, each with a demand charge of ₹400 per kVA per month: AEML ₹5.73 per kVAh plus ₹0.57 wheeling, Tata Power-D ₹5.67 plus ₹0.69, and BEST ₹5.47 plus ₹0.88.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.44 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹11.6 lakh |
| 250 kW | 3.5 lakh units | 2,500 sq m | ₹29.1 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹58.2 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹1.16 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Dondaicha
These are the Somaya Solar projects closest to Dondaicha, with straight-line distances. They are shown as references and are not in Dondaicha unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 910 km from Dondaicha. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 980 km from Dondaicha. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1020 km from Dondaicha. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Dondaicha
Which electricity company handles solar connections in Dondaicha?
Maharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Dhule district.
Is net metering available for factories and commercial buildings in Dondaicha?
Net metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed. The rule is the same across Maharashtra.
How much electricity does a solar plant generate in Dondaicha?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dondaicha?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 870 km from Dondaicha in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 910 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dondaicha
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 (30 December 2019), First Amendment Regulations, 2023 (Gazette, 16 November 2023) and Second Amendment Regulations, 2024 (29 August 2024); MERC practice direction of 30 June 2026; MERC order of 25 March 2026 in Case No. 75 of 2025 (MSEDCL); MERC MYT order of 28 March 2025 in Case No. 217 of 2024
- MERC order dated 25 March 2026 in Case No. 75 of 2025 (MSEDCL), Summary of HT Tariff for FY 2026-27 and Table 8; MERC MYT orders of 28 March 2025 for AEML-D (Case No. 211 of 2024), TPC-D (Case No. 210 of 2024) and BEST (Case No. 207 of 2024)
- MSEDCL company profile
- PVGIS, European Commission Joint Research Centre (solar output model)