Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Gangtok, Sikkim. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Gangtok

The Government of India's One District One Product (ODOP) list names Tourism, Pharma related and Handloom and Handicraft as the products of Gangtok district.

Metering rules for business rooftops in Gangtok

In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.

The size limits, charges and other conditions for Sikkim are on the page Commercial & Industrial Solar in Sikkim.

In Gangtok the application for connection and metering goes to PDS.

Output and bill value for a rooftop plant in Gangtok

A solar plant in Gangtok is modelled to produce about 1,010 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Supply (HTIS), 11 kV and above, contract demand above 500 kVA energy charge of ₹8.86 per kVAh (SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026, in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹560 per kVA per month also applies for this slab. For 250 to 500 kVA the rate is ₹8.36 per kVAh with ₹290 per kVA per month, and up to 250 kVA it is ₹7.86 per kVAh with ₹250 per kVA per month. Demand above the contract demand is billed at twice the demand charge. Time-of-day for HT consumers: ₹0.40 per kVAh less than normal from midnight to 5 AM, and ₹1.00 per kVAh more than normal from 5 to 8 AM and from 5 to 8 PM. A 5% annual surcharge applies on unpaid current-year bills. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.86 per kVAh
100 kW1.0 lakh units1,000 sq m₹8.9 lakh
250 kW2.5 lakh units2,500 sq m₹22.4 lakh
500 kW5.0 lakh units5,000 sq m₹44.7 lakh
1 MW10.1 lakh units10,000 sq m₹89.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Gangtok

These are the Somaya Solar projects closest to Gangtok, with straight-line distances. They are shown as references and are not in Gangtok unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 860 km from Gangtok. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 970 km from Gangtok. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1060 km from Gangtok. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Gangtok

Which electricity company handles solar connections in Gangtok?

Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gangtok district.

Is net metering available for factories and commercial buildings in Gangtok?

Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV. The rule is the same across Sikkim.

How much electricity does a solar plant generate in Gangtok?

About 1,010 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Gangtok?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1110 km from Gangtok in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 860 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gangtok

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image