Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gangtok, Sikkim.

Gangtok at a glance for solar projects

District and stateGangtok district, Sikkim
Electricity supplyPower Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gangtok district.
Electricity regulatorSikkim State Electricity Regulatory Commission (SSERC)
State renewable energy agencySikkim Renewable Energy Development Agency (SREDA)
Rooftop metering for businessesNet metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV
Modelled solar outputabout 1,010 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1110 km from Gangtok in a straight line

Solar services in Gangtok

Local points for solar projects in Gangtok

The Government of India's One District One Product (ODOP) list names Tourism, Pharma related and Handloom and Handicraft as the products of Gangtok district.

Solar output in Gangtok

A solar plant in Gangtok is modelled to produce about 1,010 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Supply (HTIS), 11 kV and above, contract demand above 500 kVA energy charge of ₹8.86 per kVAh (SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026, in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹560 per kVA per month also applies for this slab. For 250 to 500 kVA the rate is ₹8.36 per kVAh with ₹290 per kVA per month, and up to 250 kVA it is ₹7.86 per kVAh with ₹250 per kVA per month. Demand above the contract demand is billed at twice the demand charge. Time-of-day for HT consumers: ₹0.40 per kVAh less than normal from midnight to 5 AM, and ₹1.00 per kVAh more than normal from 5 to 8 AM and from 5 to 8 PM. A 5% annual surcharge applies on unpaid current-year bills. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.86 per kVAh
100 kW1.0 lakh units1,000 sq m₹8.9 lakh
500 kW5.0 lakh units5,000 sq m₹44.7 lakh
1 MW10.1 lakh units10,000 sq m₹89.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Gangtok

For a rooftop array in Gangtok the strongest month is April, at about 108 units for each kW installed, and the weakest is July, at about 67. For a ground-mounted array at a 29° tilt the strongest month is March (about 109) and the weakest is July (about 62). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January7590
February7786
March104109
April108106
May107100
June8275
July6762
August7571
September7880
October93102
November7690
December7186

Somaya Solar projects near Gangtok

These are the Somaya Solar projects closest to Gangtok, with straight-line distances. They are shown as references and are not in Gangtok unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 860 km from Gangtok. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 910 km from Gangtok. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 970 km from Gangtok. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Gangtok

Which electricity company handles solar connections in Gangtok?

Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gangtok district.

Is net metering available for factories and commercial buildings in Gangtok?

Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV. The rule is the same across Sikkim.

How much electricity does a solar plant generate in Gangtok?

About 1,010 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Gangtok?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1110 km from Gangtok in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 860 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gangtok

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image