Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gangtok, Sikkim.
Gangtok at a glance for solar projects
| District and state | Gangtok district, Sikkim |
|---|---|
| Electricity supply | Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gangtok district. |
| Electricity regulator | Sikkim State Electricity Regulatory Commission (SSERC) |
| State renewable energy agency | Sikkim Renewable Energy Development Agency (SREDA) |
| Rooftop metering for businesses | Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV |
| Modelled solar output | about 1,010 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1110 km from Gangtok in a straight line |
Solar services in Gangtok
- Solar EPC Company in Gangtok
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Gangtok
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Gangtok
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Gangtok
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Gangtok
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Gangtok
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Gangtok
The Government of India's One District One Product (ODOP) list names Tourism, Pharma related and Handloom and Handicraft as the products of Gangtok district.
Solar output in Gangtok
A solar plant in Gangtok is modelled to produce about 1,010 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Supply (HTIS), 11 kV and above, contract demand above 500 kVA energy charge of ₹8.86 per kVAh (SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026, in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹560 per kVA per month also applies for this slab. For 250 to 500 kVA the rate is ₹8.36 per kVAh with ₹290 per kVA per month, and up to 250 kVA it is ₹7.86 per kVAh with ₹250 per kVA per month. Demand above the contract demand is billed at twice the demand charge. Time-of-day for HT consumers: ₹0.40 per kVAh less than normal from midnight to 5 AM, and ₹1.00 per kVAh more than normal from 5 to 8 AM and from 5 to 8 PM. A 5% annual surcharge applies on unpaid current-year bills. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.86 per kVAh |
|---|---|---|---|
| 100 kW | 1.0 lakh units | 1,000 sq m | ₹8.9 lakh |
| 500 kW | 5.0 lakh units | 5,000 sq m | ₹44.7 lakh |
| 1 MW | 10.1 lakh units | 10,000 sq m | ₹89.5 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Gangtok
For a rooftop array in Gangtok the strongest month is April, at about 108 units for each kW installed, and the weakest is July, at about 67. For a ground-mounted array at a 29° tilt the strongest month is March (about 109) and the weakest is July (about 62). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 75 | 90 |
| February | 77 | 86 |
| March | 104 | 109 |
| April | 108 | 106 |
| May | 107 | 100 |
| June | 82 | 75 |
| July | 67 | 62 |
| August | 75 | 71 |
| September | 78 | 80 |
| October | 93 | 102 |
| November | 76 | 90 |
| December | 71 | 86 |
Somaya Solar projects near Gangtok
These are the Somaya Solar projects closest to Gangtok, with straight-line distances. They are shown as references and are not in Gangtok unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 860 km from Gangtok. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 910 km from Gangtok. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 970 km from Gangtok. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Gangtok
Which electricity company handles solar connections in Gangtok?
Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gangtok district.
Is net metering available for factories and commercial buildings in Gangtok?
Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV. The rule is the same across Sikkim.
How much electricity does a solar plant generate in Gangtok?
About 1,010 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Gangtok?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1110 km from Gangtok in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 860 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gangtok
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Power Department, Government of Sikkim, SREDA page; SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, which give SREDA the sanction role for rooftop solar
- SSERC (Grid Interactive Solar PV Systems) Regulations, 2021 (31 December 2021), with the amendments of 12 June 2024, 4 September 2024 and 2 May 2025
- SSERC tariff order for the Power Department, FY 2026-27 (30 June 2026), para 1.3
- SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026 (tariff schedule, HTIS; paragraph 10.5 for time-of-day)
- Sikkim State Electricity Regulatory Commission (SSERC), Gangtok