Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gyalshing, Sikkim.

Gyalshing at a glance for solar projects

District and stateGyalshing district, Sikkim
Electricity supplyPower Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gyalshing district.
Electricity regulatorSikkim State Electricity Regulatory Commission (SSERC)
State renewable energy agencySikkim Renewable Energy Development Agency (SREDA)
Rooftop metering for businessesNet metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV
Modelled solar outputabout 950 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1070 km from Gyalshing in a straight line

Solar services in Gyalshing

Local points for solar projects in Gyalshing

The Government of India's One District One Product (ODOP) list names Tourism, Trout Fishing and Handloom and Handicraft as the products of Gyalshing district.

Solar output in Gyalshing

A solar plant in Gyalshing is modelled to produce about 950 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Supply (HTIS), 11 kV and above, contract demand above 500 kVA energy charge of ₹8.86 per kVAh (SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026, in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹560 per kVA per month also applies for this slab. For 250 to 500 kVA the rate is ₹8.36 per kVAh with ₹290 per kVA per month, and up to 250 kVA it is ₹7.86 per kVAh with ₹250 per kVA per month. Demand above the contract demand is billed at twice the demand charge. Time-of-day for HT consumers: ₹0.40 per kVAh less than normal from midnight to 5 AM, and ₹1.00 per kVAh more than normal from 5 to 8 AM and from 5 to 8 PM. A 5% annual surcharge applies on unpaid current-year bills. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.86 per kVAh
100 kW0.9 lakh units1,000 sq m₹8.4 lakh
500 kW4.8 lakh units5,000 sq m₹42.1 lakh
1 MW9.5 lakh units10,000 sq m₹84.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Gyalshing

For a rooftop array in Gyalshing the strongest month is April, at about 103 units for each kW installed, and the weakest is July, at about 64. For a ground-mounted array at a 30° tilt the strongest month is March (about 102) and the weakest is July (about 59). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January6883
February6978
March96102
April103101
May10194
June7770
July6459
August7168
September7677
October8796
November7387
December6783

Somaya Solar projects near Gyalshing

These are the Somaya Solar projects closest to Gyalshing, with straight-line distances. They are shown as references and are not in Gyalshing unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 830 km from Gyalshing. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 880 km from Gyalshing. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 940 km from Gyalshing. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Gyalshing

Which electricity company handles solar connections in Gyalshing?

Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gyalshing district.

Is net metering available for factories and commercial buildings in Gyalshing?

Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV. The rule is the same across Sikkim.

How much electricity does a solar plant generate in Gyalshing?

About 950 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 9.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Gyalshing?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1070 km from Gyalshing in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 830 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gyalshing

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.