Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Gyalshing, Sikkim. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Gyalshing at a glance for solar projects
| District and state | Gyalshing district, Sikkim |
|---|---|
| Electricity supply | Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gyalshing district. |
| Electricity regulator | Sikkim State Electricity Regulatory Commission (SSERC) |
| State renewable energy agency | Sikkim Renewable Energy Development Agency (SREDA) |
| Rooftop metering for businesses | Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV |
| Modelled solar output | about 950 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1070 km from Gyalshing in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Gyalshing
In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.
The size limits, charges and other conditions for Sikkim are on the page Solar EPC Company in Sikkim.
In Gyalshing the application for connection and metering goes to PDS.
What a plant produces in Gyalshing
A solar plant in Gyalshing is modelled to produce about 950 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Supply (HTIS), 11 kV and above, contract demand above 500 kVA energy charge of ₹8.86 per kVAh (SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026, in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹560 per kVA per month also applies for this slab. For 250 to 500 kVA the rate is ₹8.36 per kVAh with ₹290 per kVA per month, and up to 250 kVA it is ₹7.86 per kVAh with ₹250 per kVA per month. Demand above the contract demand is billed at twice the demand charge. Time-of-day for HT consumers: ₹0.40 per kVAh less than normal from midnight to 5 AM, and ₹1.00 per kVAh more than normal from 5 to 8 AM and from 5 to 8 PM. A 5% annual surcharge applies on unpaid current-year bills. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.86 per kVAh |
|---|---|---|---|
| 100 kW | 0.9 lakh units | 1,000 sq m | ₹8.4 lakh |
| 500 kW | 4.8 lakh units | 5,000 sq m | ₹42.1 lakh |
| 1 MW | 9.5 lakh units | 10,000 sq m | ₹84.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Gyalshing
The Government of India's One District One Product (ODOP) list names Tourism, Trout Fishing and Handloom and Handicraft as the products of Gyalshing district.
EPC projects by Somaya Solar near Gyalshing
These are the Somaya Solar projects closest to Gyalshing, with straight-line distances. They are shown as references and are not in Gyalshing unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 830 km from Gyalshing. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 880 km from Gyalshing. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 940 km from Gyalshing. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Gyalshing
Which electricity company handles solar connections in Gyalshing?
Power Department, Government of Sikkim (PDS) is the distribution utility for Sikkim and supplies Gyalshing district.
Is net metering available for factories and commercial buildings in Gyalshing?
Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV. The rule is the same across Sikkim.
How much electricity does a solar plant generate in Gyalshing?
About 950 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 9.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Gyalshing?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1070 km from Gyalshing in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 830 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gyalshing
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Power Department, Government of Sikkim, SREDA page; SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, which give SREDA the sanction role for rooftop solar
- SSERC (Grid Interactive Solar PV Systems) Regulations, 2021 (31 December 2021), with the amendments of 12 June 2024, 4 September 2024 and 2 May 2025
- SSERC tariff order for the Power Department, FY 2026-27 (30 June 2026), para 1.3
- SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026 (tariff schedule, HTIS; paragraph 10.5 for time-of-day)
- Sikkim State Electricity Regulatory Commission (SSERC), Gangtok