Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Sikkim. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Sikkim at a glance for solar projects
| Electricity regulator | Sikkim State Electricity Regulatory Commission (SSERC) |
|---|---|
| State renewable energy agency | Sikkim Renewable Energy Development Agency (SREDA) |
| Electricity distribution | PDS (The whole state of Sikkim, including Gangtok) |
| Rooftop metering for businesses | Net metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Sikkim
In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.
- A consumer with a sanctioned connected load above 10 kW may install a system of 40% of the sanctioned load or contract demand, or 10 kW, whichever is higher. A consumer of 10 kW or less may install up to 10 kW.
- The maximum by supply voltage is 10 kWp on single-phase LT, 20 kWp on three-phase LT and 500 kWp on HT at 11,000 volts.
- The earlier limits that the total capacity of all systems on one distribution transformer is 30% of its peak capacity, and on one 66/11 or 33/11 kV substation is 30% of its peak capacity, still apply.
- Net electricity banked at the end of the settlement period, which is the financial year, is paid at 70% of the average power purchase cost approved for the year the system was commissioned. This rate holds for the whole life of the system.
- Excess energy can be wheeled to other premises of the same owner in the licensee's area. The owner gets 95% of the energy wheeled, and this applies only if the quantity wheeled is more than 500 units a month.
- A system of up to 10 kW needs no technical feasibility study, and the licensee raises the sanctioned load to match if required. Systems owned by a third party are also covered.
What a plant produces in Sikkim
Solar output changes across Sikkim with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 950 to 1,010 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Gangtok | 1,010 | 1,060 |
| Gyalshing | 950 | 1,000 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Sikkim
Is net metering available for factories and commercial buildings in Sikkim?
In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sikkim
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- Power Department, Government of Sikkim, SREDA page; SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, which give SREDA the sanction role for rooftop solar
- SSERC (Grid Interactive Solar PV Systems) Regulations, 2021 (31 December 2021), with the amendments of 12 June 2024, 4 September 2024 and 2 May 2025
- SSERC tariff order for the Power Department, Government of Sikkim, FY 2026-27, dated 30 June 2026 (paragraph 1.3)
- Sikkim State Electricity Regulatory Commission (SSERC), Gangtok