Turnkey Solar EPC Solutions in Sikkim

Somaya Solar Solutions Limited delivers turnkey solar projects in Sikkim: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Sikkim

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Sikkim

In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.

  • A consumer with a sanctioned connected load above 10 kW may install a system of 40% of the sanctioned load or contract demand, or 10 kW, whichever is higher. A consumer of 10 kW or less may install up to 10 kW.
  • The maximum by supply voltage is 10 kWp on single-phase LT, 20 kWp on three-phase LT and 500 kWp on HT at 11,000 volts.
  • The earlier limits that the total capacity of all systems on one distribution transformer is 30% of its peak capacity, and on one 66/11 or 33/11 kV substation is 30% of its peak capacity, still apply.
  • Net electricity banked at the end of the settlement period, which is the financial year, is paid at 70% of the average power purchase cost approved for the year the system was commissioned. This rate holds for the whole life of the system.
  • Excess energy can be wheeled to other premises of the same owner in the licensee's area. The owner gets 95% of the energy wheeled, and this applies only if the quantity wheeled is more than 500 units a month.
  • A system of up to 10 kW needs no technical feasibility study, and the licensee raises the sanctioned load to match if required. Systems owned by a third party are also covered.

What to expect from the plant in Sikkim

Solar output changes across Sikkim with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 950 to 1,010 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Gangtok1,0101,060
Gyalshing9501,000

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Sikkim

Is net metering available for factories and commercial buildings in Sikkim?

In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sikkim

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.