Somaya Solar Solutions Limited builds ground-mounted solar power plants in Sikkim for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Sikkim
Solar output changes across Sikkim with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,000 to 1,060 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Gangtok | 1,010 | 1,060 |
| Gyalshing | 950 | 1,000 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Sikkim
Under SSERC's Green Energy Open Access Regulations, 2023, a consumer with a contracted demand or sanctioned load of 100 kW or more, other than a captive user, can take renewable power through open access. A captive generating plant has the right to open access under section 9 of the Act. The tariff order for 2026-27 sets the wheeling charge, the open access transmission charge and the cross-subsidy surcharge.
- Banked energy carries a banking charge of 8% of the energy banked, adjusted in kind.
- Wheeling charge for 2026-27: ₹0.63 per kWh. The computed charge was ₹2.51 and the Commission fixed it at 25% of that to help open access users. It is not split by voltage.
- Open access transmission charge for 2026-27: ₹2,25,000 per MW per month, which applies only to users of the intra-state transmission system.
- Cross-subsidy surcharge for 2026-27: ₹1.78 per unit for HT open access consumers of 1 MW and above. It applies from the date of the order.
- The Commission did not set an additional surcharge for 2026-27 because the Power Department made no proposal, and directed it to file one in the next tariff petition.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Sikkim
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sikkim
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.