Utility-Scale Solar Power Plant Installation in Sikkim

Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Sikkim as an EPC contractor: engineering, supply, construction and commissioning.

What Sikkim's policy says about large solar plants

Under SSERC's Green Energy Open Access Regulations, 2023, a consumer with a contracted demand or sanctioned load of 100 kW or more, other than a captive user, can take renewable power through open access. A captive generating plant has the right to open access under section 9 of the Act. The tariff order for 2026-27 sets the wheeling charge, the open access transmission charge and the cross-subsidy surcharge.

  • Banked energy carries a banking charge of 8% of the energy banked, adjusted in kind.
  • Wheeling charge for 2026-27: ₹0.63 per kWh. The computed charge was ₹2.51 and the Commission fixed it at 25% of that to help open access users. It is not split by voltage.
  • Open access transmission charge for 2026-27: ₹2,25,000 per MW per month, which applies only to users of the intra-state transmission system.
  • Cross-subsidy surcharge for 2026-27: ₹1.78 per unit for HT open access consumers of 1 MW and above. It applies from the date of the order.
  • The Commission did not set an additional surcharge for 2026-27 because the Power Department made no proposal, and directed it to file one in the next tariff petition.

Output and land at megawatt scale in Sikkim

Solar output changes across Sikkim with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,000 to 1,060 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Gangtok1,0101,060
Gyalshing9501,000

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Sikkim

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sikkim

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.