Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Garamur, Assam. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Garamur at a glance for solar projects
| District and state | Majuli district, Assam |
|---|---|
| Electricity supply | Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Majuli district. |
| Electricity regulator | Assam Electricity Regulatory Commission (AERC) |
| State renewable energy agency | Assam Energy Development Agency (AEDA) |
| State solar policy | Assam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand |
| Modelled solar output | about 1,150 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1650 km from Garamur in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Garamur
In Assam, rooftop solar is governed by the AERC (Grid Interactive Solar PV Systems) Regulations, 2019, notified on 6 August 2019 and amended on 18 June 2024. APDCL has asked the regulator to cut net metering benefits and stop paying for surplus energy. AERC has not changed the rules. On 5 August 2026 it told APDCL to keep processing applications under the existing rules while the petition is pending.
The size limits, charges and other conditions for Assam are on the page Solar EPC Company in Assam.
In Garamur the application for connection and metering goes to APDCL.
What a plant produces in Garamur
A solar plant in Garamur is modelled to produce about 1,150 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.09 per kWh |
|---|---|---|---|
| 100 kW | 1.1 lakh units | 1,000 sq m | ₹9.3 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹46.5 lakh |
| 1 MW | 11.5 lakh units | 10,000 sq m | ₹93.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Garamur
The Government of India's One District One Product (ODOP) list names Mustard Seeds as the product of Majuli district.
EPC projects by Somaya Solar near Garamur
These are the Somaya Solar projects closest to Garamur, with straight-line distances. They are shown as references and are not in Garamur unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1410 km from Garamur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1430 km from Garamur. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1510 km from Garamur. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Garamur
Which electricity company handles solar connections in Garamur?
Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Majuli district.
Is net metering available for factories and commercial buildings in Garamur?
Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.
How much electricity does a solar plant generate in Garamur?
About 1,150 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Garamur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1650 km from Garamur in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1410 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Garamur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AERC order sheet of 5 August 2026, Petition No. 09/2026, which reproduces the AERC (Grid Interactive Solar PV Systems) Regulations, 2019 and the First Amendment of 18 June 2024; Assam Integrated Clean Energy Policy, 2025, clause 6.1
- APDCL notice of tariff schedule w.e.f. 1 April 2026 (AERC order of 6 March 2026); AERC press release of 6 March 2026
- Assam Electricity Regulatory Commission
- Assam Energy Development Agency, What We Do (State Nodal Agency of MNRE); AEDA page on PM KUSUM Component B
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam, notification PEL.19/2025/13, 24 February 2025); AERC order of 5 August 2026 (Petition No. 09/2026)
- Assam Integrated Clean Energy Policy, 2025, definitions
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Majuli District website (Government of Assam), home page "District at a Glance"
- PVGIS, European Commission Joint Research Centre (solar output model)