Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Greater Noida, Uttar Pradesh.

Greater Noida at a glance for solar projects

District and stateGautam Buddha Nagar district, Uttar Pradesh
Electricity supplyNoida Power Company Limited (NPCL), a private distribution licensee, supplies Greater Noida. Its licence for distribution and retail supply in Greater Noida was granted on 30 August 1993. Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies the rest of Gautam Buddha Nagar district.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 20 km from Greater Noida in a straight line

Solar services in Greater Noida

Greater Noida and the National Capital Region

Gautam Buddha Nagar district is one of the eight Uttar Pradesh districts in the National Capital Region, by the list of the NCR Planning Board.

The Graded Response Action Plan for air quality covers the whole National Capital Region. From Stage I, diesel generator sets are not to be used as a regular source of power, and from Stage II their running is regulated across industrial, commercial and residential users. Solar does not replace backup power on its own, but it cuts the daytime energy a unit has to draw from the grid.

NPCL has its own rate schedule. For 2026-27 its consumers get a regulatory discount of 10% on the demand charge and the energy charge. For large industrial consumers (HV-2), NPCL's time-of-day schedule also lowers the energy charge by 15% between 07:00 and 16:00 from April to September, the hours in which a solar plant produces most. Both lower the value of each solar unit compared with a PVVNL connection in the same district, so work out the plant size on the NPCL bill.

The Government of India's One District One Product (ODOP) list names Readymade Garments and Textile Products as the product of Gautam Buddha Nagar district.

Solar output in Greater Noida

A solar plant in Greater Noida is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹6.39 per kVAh (NPCL rate schedule in the UPERC tariff order of 2 July 2026 for 2026-27: ₹7.10 less the 10% regulatory discount given to NPCL consumers). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1. It does not count NPCL's time-of-day rates.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.39 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.1 lakh
500 kW7.1 lakh units5,000 sq m₹45.4 lakh
1 MW14.2 lakh units10,000 sq m₹90.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Greater Noida

For a rooftop array in Greater Noida the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 98. For a ground-mounted array at a 32° tilt the strongest month is March (about 149) and the weakest is July (about 90). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January108137
February113132
March139149
April144141
May147133
June127111
July10090
August9893
September106109
October123140
November108135
December106138

Somaya Solar projects near Greater Noida

These are the Somaya Solar projects closest to Greater Noida, with straight-line distances. They are shown as references and are not in Greater Noida unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 100 km from Greater Noida. In progress. Site access was difficult and was handled with local support.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 160 km from Greater Noida. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 170 km from Greater Noida. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Greater Noida

Which electricity company handles solar connections in Greater Noida?

Noida Power Company Limited (NPCL), a private distribution licensee, supplies Greater Noida. Its licence for distribution and retail supply in Greater Noida was granted on 30 August 1993. Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies the rest of Gautam Buddha Nagar district.

Is net metering available for factories and commercial buildings in Greater Noida?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Greater Noida?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Greater Noida?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 20 km from Greater Noida in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 100 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Greater Noida

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.