Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Gurugram, Haryana. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Gurugram: industrial areas
HSIIDC, the Haryana State Industrial and Infrastructure Development Corporation, lists Udyog Vihar, Gurugram among its industrial areas in Gurugram district.
The Government of India's One District One Product (ODOP) list names Textile and Apparels and Enginering Goods as the products of Gurugram district.
Metering rules for business rooftops in Gurugram
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
The size limits, charges and other conditions for Haryana are on the page Commercial & Industrial Solar in Haryana.
In Gurugram the application for connection and metering goes to DHBVN.
Output and bill value for a rooftop plant in Gurugram
A solar plant in Gurugram is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.95 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.9 lakh |
| 250 kW | 3.5 lakh units | 2,500 sq m | ₹24.7 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹49.3 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹98.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Gurugram
These are the Somaya Solar projects closest to Gurugram, with straight-line distances. They are shown as references and are not in Gurugram unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 190 km from Gurugram. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 200 km from Gurugram. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 210 km from Gurugram. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Gurugram
Which electricity company handles solar connections in Gurugram?
Dakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Gurugram district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Gurugram?
Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.
How much electricity does a solar plant generate in Gurugram?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Gurugram?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 50 km from Gurugram in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 190 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gurugram
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DHBVN website, DHBVN at a glance
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- HSIIDC: list of Industrial Estates (IE) developed/being developed
- PVGIS, European Commission Joint Research Centre (solar output model)
- UHBVN Sales Circular U-03/2026 of 21 April 2026, schedule of tariff for 2026-27 under the HERC order of 25 March 2026 (same rates in DHBVN Sales Circular D-06/2026 of 13 May 2026)