Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Haryana. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Metering rules for business rooftops in Haryana
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
- Gross metering is the other arrangement under the same regulations. It is allowed up to the sanctioned load or contract demand. Net billing, group net metering and virtual net metering do not appear in the regulations or their two amendments.
- The plant may not be larger than the sanctioned load (low-tension connection) or the contract demand (high-tension connection). The smallest plant allowed is 1 kW.
- The total rooftop capacity on one distribution transformer may not exceed 50% of that transformer's rated capacity. On a power transformer the limit is 30%.
- The second amendment, notified on 30 October 2025 and published in the gazette on 11 November 2025, removed the old rule that set off solar units against only 90% of consumption. The settlement period now runs from 1 October to 30 September.
- Units left unadjusted at the end of the settlement period are bought by the distribution company at 90% of the feed-in tariff in the regulations. The 2021 regulations set that tariff at ₹3.11 per unit for five years. Check the current rate with the distribution company.
- A consumer who draws power through open access cannot have net metering. A plant larger than the sanctioned load or contract demand has to use a route other than net or gross metering.
- The plant may be owned by the consumer or by a third party (RESCO model). The consumer keeps paying fixed or demand charges.
Output and bill value for a rooftop plant in Haryana
Solar output changes across Haryana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,380 to 1,460 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ambala | 1,400 | 1,500 |
| Ambala Sadar | 1,400 | 1,500 |
| Asandh | 1,420 | 1,510 |
| Bahadurgarh | 1,420 | 1,520 |
| Barara | 1,400 | 1,500 |
| Bawal | 1,430 | 1,520 |
| Bawani Khera | 1,430 | 1,530 |
| Bhiwani | 1,430 | 1,520 |
| Charkhi Dadri | 1,430 | 1,520 |
| Chika | 1,410 | 1,510 |
| Dabwali | 1,450 | 1,540 |
| Dharuhera | 1,430 | 1,520 |
| Ellenabad | 1,460 | 1,560 |
| Faridabad | 1,420 | 1,510 |
| Fatehabad | 1,440 | 1,530 |
| Firozpur Jhirka | 1,420 | 1,510 |
| Ganaur | 1,420 | 1,510 |
| Gharaunda | 1,410 | 1,510 |
| Gohana | 1,430 | 1,520 |
| Gurugram | 1,420 | 1,510 |
| Hisar | 1,450 | 1,540 |
| Hodal | 1,420 | 1,500 |
| Jagadhri | 1,380 | 1,490 |
| Jhajjar | 1,430 | 1,520 |
| Jind | 1,420 | 1,520 |
| Kaithal | 1,420 | 1,510 |
| Kalanaur | 1,430 | 1,520 |
| Kalanwali | 1,440 | 1,540 |
| Karnal | 1,420 | 1,510 |
| Kharkhauda | 1,420 | 1,520 |
| Kundli | 1,420 | 1,510 |
| Kurukshetra | 1,410 | 1,510 |
| Ladwa | 1,400 | 1,500 |
| Maham | 1,430 | 1,520 |
| Mahendragarh | 1,440 | 1,530 |
| Mandi Dabwali | 1,450 | 1,540 |
| Manesar | 1,430 | 1,520 |
| Naraingarh | 1,390 | 1,490 |
| Narnaul | 1,440 | 1,530 |
| Narwana | 1,430 | 1,520 |
| Palwal | 1,420 | 1,510 |
| Panchkula | 1,390 | 1,500 |
| Panipat | 1,420 | 1,510 |
| Pataudi | 1,430 | 1,520 |
| Pehowa | 1,420 | 1,520 |
| Pinjaur | 1,380 | 1,490 |
| Punahana | 1,420 | 1,500 |
| Pundri | 1,420 | 1,510 |
| Rania | 1,440 | 1,540 |
| Ratia | 1,440 | 1,530 |
| Rewari | 1,430 | 1,520 |
| Rohtak | 1,430 | 1,520 |
| Safidon | 1,420 | 1,520 |
| Samalkha | 1,420 | 1,510 |
| Sampla | 1,420 | 1,510 |
| Shahabad | 1,410 | 1,510 |
| Sirsa | 1,440 | 1,540 |
| Sohna | 1,420 | 1,510 |
| Sonipat | 1,420 | 1,510 |
| Taoru | 1,430 | 1,520 |
| Thanesar | 1,410 | 1,510 |
| Tirawari | 1,410 | 1,510 |
| Tohana | 1,430 | 1,530 |
| Yamunanagar | 1,390 | 1,490 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Questions about solar projects in Haryana
Is net metering available for factories and commercial buildings in Haryana?
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Haryana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- PVGIS, European Commission Joint Research Centre (solar output model)