Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Haryana and what we do on such a project.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components.
- Component A: decentralised solar plants of up to 2 MW on farmers' land.
- Component B: solar pumps for agriculture.
- Component C: solarisation of grid-connected agriculture pumps, including feeder-level solarisation.
Who runs PM-KUSUM in Haryana
In Haryana the two state distribution companies (UHBVN and DHBVN) run Component A and Component C. The Department of New & Renewable Energy (HAREDA) runs Component B, the stand-alone solar pumps.
- Progress reported to the Lok Sabha up to 30 June 2026: the yearly figures add up to 60.21 MW installed under Component A since 2022-23 and 1,94,969 solar pumps installed under Component B since 2020-21. Nothing is shown as solarised under Component C.
- DHBVN's invitation of 23 February 2024 for Component A plants of 500 kW to 2 MW gave a pre-fixed tariff of ₹3.11 per unit for 25 years, set by HERC. The Haryana Power Purchase Centre signs the power purchase agreement. Confirm the tariff in force with the distribution company before signing.
- After HERC's order of 20 August 2025, Component A plants connected at 11 kV do not need long-term open access or QCA registration. UHBVN issues the charging permission itself.
- The Ministry of New and Renewable Energy has extended the scheme to 31 March 2027 for all components.
What a PM-KUSUM plant produces in Haryana
Solar output changes across Haryana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,490 to 1,560 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ambala | 1,400 | 1,500 |
| Ambala Sadar | 1,400 | 1,500 |
| Asandh | 1,420 | 1,510 |
| Bahadurgarh | 1,420 | 1,520 |
| Barara | 1,400 | 1,500 |
| Bawal | 1,430 | 1,520 |
| Bawani Khera | 1,430 | 1,530 |
| Bhiwani | 1,430 | 1,520 |
| Charkhi Dadri | 1,430 | 1,520 |
| Chika | 1,410 | 1,510 |
| Dabwali | 1,450 | 1,540 |
| Dharuhera | 1,430 | 1,520 |
| Ellenabad | 1,460 | 1,560 |
| Faridabad | 1,420 | 1,510 |
| Fatehabad | 1,440 | 1,530 |
| Firozpur Jhirka | 1,420 | 1,510 |
| Ganaur | 1,420 | 1,510 |
| Gharaunda | 1,410 | 1,510 |
| Gohana | 1,430 | 1,520 |
| Gurugram | 1,420 | 1,510 |
| Hisar | 1,450 | 1,540 |
| Hodal | 1,420 | 1,500 |
| Jagadhri | 1,380 | 1,490 |
| Jhajjar | 1,430 | 1,520 |
| Jind | 1,420 | 1,520 |
| Kaithal | 1,420 | 1,510 |
| Kalanaur | 1,430 | 1,520 |
| Kalanwali | 1,440 | 1,540 |
| Karnal | 1,420 | 1,510 |
| Kharkhauda | 1,420 | 1,520 |
| Kundli | 1,420 | 1,510 |
| Kurukshetra | 1,410 | 1,510 |
| Ladwa | 1,400 | 1,500 |
| Maham | 1,430 | 1,520 |
| Mahendragarh | 1,440 | 1,530 |
| Mandi Dabwali | 1,450 | 1,540 |
| Manesar | 1,430 | 1,520 |
| Naraingarh | 1,390 | 1,490 |
| Narnaul | 1,440 | 1,530 |
| Narwana | 1,430 | 1,520 |
| Palwal | 1,420 | 1,510 |
| Panchkula | 1,390 | 1,500 |
| Panipat | 1,420 | 1,510 |
| Pataudi | 1,430 | 1,520 |
| Pehowa | 1,420 | 1,520 |
| Pinjaur | 1,380 | 1,490 |
| Punahana | 1,420 | 1,500 |
| Pundri | 1,420 | 1,510 |
| Rania | 1,440 | 1,540 |
| Ratia | 1,440 | 1,530 |
| Rewari | 1,430 | 1,520 |
| Rohtak | 1,430 | 1,520 |
| Safidon | 1,420 | 1,520 |
| Samalkha | 1,420 | 1,510 |
| Sampla | 1,420 | 1,510 |
| Shahabad | 1,410 | 1,510 |
| Sirsa | 1,440 | 1,540 |
| Sohna | 1,420 | 1,510 |
| Sonipat | 1,420 | 1,510 |
| Taoru | 1,430 | 1,520 |
| Thanesar | 1,410 | 1,510 |
| Tirawari | 1,410 | 1,510 |
| Tohana | 1,430 | 1,530 |
| Yamunanagar | 1,390 | 1,490 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
Questions about solar projects in Haryana
Who do I apply to for PM-KUSUM in Haryana?
In Haryana the two state distribution companies (UHBVN and DHBVN) run Component A and Component C. The Department of New & Renewable Energy (HAREDA) runs Component B, the stand-alone solar pumps.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Haryana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy)
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy); HAREDA solar water pumping programme page; DHBVN walk-in invitation for Component A of 23 February 2024; UHBVN Sales Circular U-19/2025 of 9 December 2025
- PVGIS, European Commission Joint Research Centre (solar output model)