Turnkey Solar EPC Solutions in Haryana

Somaya Solar Solutions Limited delivers turnkey solar projects in Haryana: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Haryana

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Haryana

In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.

  • Gross metering is the other arrangement under the same regulations. It is allowed up to the sanctioned load or contract demand. Net billing, group net metering and virtual net metering do not appear in the regulations or their two amendments.
  • The plant may not be larger than the sanctioned load (low-tension connection) or the contract demand (high-tension connection). The smallest plant allowed is 1 kW.
  • The total rooftop capacity on one distribution transformer may not exceed 50% of that transformer's rated capacity. On a power transformer the limit is 30%.
  • The second amendment, notified on 30 October 2025 and published in the gazette on 11 November 2025, removed the old rule that set off solar units against only 90% of consumption. The settlement period now runs from 1 October to 30 September.
  • Units left unadjusted at the end of the settlement period are bought by the distribution company at 90% of the feed-in tariff in the regulations. The 2021 regulations set that tariff at ₹3.11 per unit for five years. Check the current rate with the distribution company.
  • A consumer who draws power through open access cannot have net metering. A plant larger than the sanctioned load or contract demand has to use a route other than net or gross metering.
  • The plant may be owned by the consumer or by a third party (RESCO model). The consumer keeps paying fixed or demand charges.

What to expect from the plant in Haryana

Solar output changes across Haryana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,380 to 1,460 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Ambala1,4001,500
Ambala Sadar1,4001,500
Asandh1,4201,510
Bahadurgarh1,4201,520
Barara1,4001,500
Bawal1,4301,520
Bawani Khera1,4301,530
Bhiwani1,4301,520
Charkhi Dadri1,4301,520
Chika1,4101,510
Dabwali1,4501,540
Dharuhera1,4301,520
Ellenabad1,4601,560
Faridabad1,4201,510
Fatehabad1,4401,530
Firozpur Jhirka1,4201,510
Ganaur1,4201,510
Gharaunda1,4101,510
Gohana1,4301,520
Gurugram1,4201,510
Hisar1,4501,540
Hodal1,4201,500
Jagadhri1,3801,490
Jhajjar1,4301,520
Jind1,4201,520
Kaithal1,4201,510
Kalanaur1,4301,520
Kalanwali1,4401,540
Karnal1,4201,510
Kharkhauda1,4201,520
Kundli1,4201,510
Kurukshetra1,4101,510
Ladwa1,4001,500
Maham1,4301,520
Mahendragarh1,4401,530
Mandi Dabwali1,4501,540
Manesar1,4301,520
Naraingarh1,3901,490
Narnaul1,4401,530
Narwana1,4301,520
Palwal1,4201,510
Panchkula1,3901,500
Panipat1,4201,510
Pataudi1,4301,520
Pehowa1,4201,520
Pinjaur1,3801,490
Punahana1,4201,500
Pundri1,4201,510
Rania1,4401,540
Ratia1,4401,530
Rewari1,4301,520
Rohtak1,4301,520
Safidon1,4201,520
Samalkha1,4201,510
Sampla1,4201,510
Shahabad1,4101,510
Sirsa1,4401,540
Sohna1,4201,510
Sonipat1,4201,510
Taoru1,4301,520
Thanesar1,4101,510
Tirawari1,4101,510
Tohana1,4301,530
Yamunanagar1,3901,490

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Haryana

Is net metering available for factories and commercial buildings in Haryana?

In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Haryana

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.