What Haryana's policy says about large solar plants

The Haryana Solar Power Policy, 2016 is the state's notified solar policy. It came into force on 14 March 2016 and stays in force until a new policy is notified. The state published a draft Haryana Solar Power Policy, 2023 for public comments, but the state agency's policy page still lists it as a draft.

  • Target: the policy planned 3,200 MW of solar power in Haryana by 2021-22 and 1,600 MW of rooftop solar by 2021-22. No later notified target was found.
  • The Renewable Energy Department is the nodal agency for the policy. With HAREDA it also acts as the single window for clearances.
  • Rooftop plants of 1 kWp to 1 MWp on industries, institutions and commercial buildings are promoted for captive use or net metering, under the regulator's regulations. No permission is needed from the building plan sanctioning authority.
  • A developer may set up a ground-mounted plant at its own cost for captive use, on the same premises or elsewhere in the state, or for sale to a third party, without approval from the Haryana Power Purchase Centre (addendum of 23 June 2017).

Under Haryana's Green Energy Open Access Regulations, 2023, as amended on 25 February 2025, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the same operation division of a distribution company.

  • There is no limit on the supply of power for captive consumers under green energy open access.
  • Banking is open to captive renewable plants in which one captive user holds at least 26% of the ownership. The charge is 8% of the banked energy, taken in units. Banked energy must be used in the same billing cycle, may not exceed 30% of the consumer's monthly consumption from the distribution company, and cannot be drawn in peak hours.
  • For 2026-27 the cross-subsidy surcharge is ₹1.45 per unit for HT supply and ₹1.18 per unit for LT supply. The additional surcharge is ₹1.37 per unit from 30 April 2026. Under the regulations, the additional surcharge does not apply to a green energy open access consumer who pays fixed charges.
  • For 2026-27 the wheeling charge is ₹0.73 per unit at HT and ₹0.94 per unit at LT. The transmission charge for short-term open access is ₹0.34 per unit.
  • Standby power from the distribution company is charged at 125% of the energy charge for the consumer's tariff category, unless the consumer gives a day's notice.
  • To accept captive status, UHBVN asks for a HAREDA registration or NOC and an undertaking to meet the 51% consumption requirement (instruction of 9 February 2026).
  • The State Load Despatch Centre grants short-term open access (up to one month). The State Transmission Utility grants medium-term and long-term open access.

Output and land at megawatt scale in Haryana

Solar output changes across Haryana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,490 to 1,560 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Ambala1,4001,500
Ambala Sadar1,4001,500
Asandh1,4201,510
Bahadurgarh1,4201,520
Barara1,4001,500
Bawal1,4301,520
Bawani Khera1,4301,530
Bhiwani1,4301,520
Charkhi Dadri1,4301,520
Chika1,4101,510
Dabwali1,4501,540
Dharuhera1,4301,520
Ellenabad1,4601,560
Faridabad1,4201,510
Fatehabad1,4401,530
Firozpur Jhirka1,4201,510
Ganaur1,4201,510
Gharaunda1,4101,510
Gohana1,4301,520
Gurugram1,4201,510
Hisar1,4501,540
Hodal1,4201,500
Jagadhri1,3801,490
Jhajjar1,4301,520
Jind1,4201,520
Kaithal1,4201,510
Kalanaur1,4301,520
Kalanwali1,4401,540
Karnal1,4201,510
Kharkhauda1,4201,520
Kundli1,4201,510
Kurukshetra1,4101,510
Ladwa1,4001,500
Maham1,4301,520
Mahendragarh1,4401,530
Mandi Dabwali1,4501,540
Manesar1,4301,520
Naraingarh1,3901,490
Narnaul1,4401,530
Narwana1,4301,520
Palwal1,4201,510
Panchkula1,3901,500
Panipat1,4201,510
Pataudi1,4301,520
Pehowa1,4201,520
Pinjaur1,3801,490
Punahana1,4201,500
Pundri1,4201,510
Rania1,4401,540
Ratia1,4401,530
Rewari1,4301,520
Rohtak1,4301,520
Safidon1,4201,520
Samalkha1,4201,510
Sampla1,4201,510
Shahabad1,4101,510
Sirsa1,4401,540
Sohna1,4201,510
Sonipat1,4201,510
Taoru1,4301,520
Thanesar1,4101,510
Tirawari1,4101,510
Tohana1,4301,530
Yamunanagar1,3901,490

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Haryana

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Haryana

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image