Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Sampla, Haryana.

Sampla at a glance for solar projects

District and stateRohtak district, Haryana
Electricity supplyUttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Rohtak district, one of the districts it lists as its area.
Electricity regulatorHaryana Electricity Regulatory Commission (HERC)
State renewable energy agencyHaryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA)
State solar policyHaryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 70 km from Sampla in a straight line

Solar services in Sampla

Local points for solar projects in Sampla

The Government of India's One District One Product (ODOP) list names Fasteners and Machine Tools as the product of Rohtak district.

Solar output in Sampla

A solar plant in Sampla is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.95 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.9 lakh
500 kW7.1 lakh units5,000 sq m₹49.3 lakh
1 MW14.2 lakh units10,000 sq m₹98.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Sampla

For a rooftop array in Sampla the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 102. For a ground-mounted array at a 32° tilt the strongest month is March (about 147) and the weakest is July (about 93). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January106135
February111131
March138147
April144141
May147133
June128113
July10393
August10297
September108111
October122139
November107134
December104137

Somaya Solar projects near Sampla

These are the Somaya Solar projects closest to Sampla, with straight-line distances. They are shown as references and are not in Sampla unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 170 km from Sampla. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 180 km from Sampla. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 190 km from Sampla. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Sampla

Which electricity company handles solar connections in Sampla?

Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Rohtak district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Sampla?

Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.

How much electricity does a solar plant generate in Sampla?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Sampla?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 70 km from Sampla in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 170 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sampla

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.