Solar EPC Company in Indore

Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Indore, Madhya Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Indore at a glance for solar projects

District and stateIndore district, Madhya Pradesh
Electricity supplyMadhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Indore district, one of the districts it lists as its area.
Electricity regulatorMadhya Pradesh Electricity Regulatory Commission (MPERC)
State renewable energy agencyOffice of the Commissioner, New and Renewable Energy, Government of Madhya Pradesh (NRE)
State solar policyMadhya Pradesh Renewable Energy Policy 2025 (in force for five years from its notification in the State Gazette, or until a new policy replaces it)
Rooftop metering for businessesNet metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW
Modelled solar outputabout 1,390 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 680 km from Indore in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Indore

In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.

The size limits, charges and other conditions for Madhya Pradesh are on the page Solar EPC Company in Madhya Pradesh.

In Indore the application for connection and metering goes to MPPaKVVCL.

What a plant produces in Indore

A solar plant in Indore is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HV-3.1), 11 kV supply energy charge of ₹7.79 per kWh (MPERC retail supply tariff order for FY 2026-27, Petition No. 140/2025, passed 26 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate of ₹7.79 per unit applies to energy up to 50% load factor; energy above 50% load factor is ₹6.79. A monthly fixed charge of ₹409 per kVA of billing demand also applies at 11 kV. At 33 kV the energy charge is ₹7.75 and ₹6.70, with a fixed charge of ₹641 per kVA. At 132 kV it is ₹7.34 and ₹6.35, with ₹729 per kVA. At 220/400 kV it is ₹6.89 and ₹5.89, with ₹729 per kVA. Time-of-day rebate or surcharge applies as set in the general terms of the HT tariff. A rebate of ₹1 per unit applies to new HT connections and, as an alternative, to incremental consumption of existing consumers, on the conditions in the order. The rates exclude taxes and duties. The same tariff order covers all three DISCOMs.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.79 per kWh
100 kW1.4 lakh units1,000 sq m₹10.8 lakh
500 kW7.0 lakh units5,000 sq m₹54.1 lakh
1 MW13.9 lakh units10,000 sq m₹1.08 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Indore: industrial areas

The Madhya Pradesh Industrial Development Corporation (MPIDC) land bank lists Readymade Garment Complex Indore, Electronic Complex Indore, Namkeen Cluster Indore and Confectionery Park Indore among its industrial areas in Indore district.

The Government of India's One District One Product (ODOP) list names Potato as the product of Indore district.

EPC projects by Somaya Solar near Indore

These are the Somaya Solar projects closest to Indore, with straight-line distances. They are shown as references and are not in Indore unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 480 km from Indore. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 710 km from Indore. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 740 km from Indore. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Indore

Which electricity company handles solar connections in Indore?

Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Indore district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Indore?

Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW. The rule is the same across Madhya Pradesh.

How much electricity does a solar plant generate in Indore?

About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Indore?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 680 km from Indore in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 480 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Indore

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.