Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Ratlam, Madhya Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Ratlam at a glance for solar projects
| District and state | Ratlam district, Madhya Pradesh |
|---|---|
| Electricity supply | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Ratlam district, one of the districts it lists as its area. |
| Electricity regulator | Madhya Pradesh Electricity Regulatory Commission (MPERC) |
| State renewable energy agency | Office of the Commissioner, New and Renewable Energy, Government of Madhya Pradesh (NRE) |
| State solar policy | Madhya Pradesh Renewable Energy Policy 2025 (in force for five years from its notification in the State Gazette, or until a new policy replaces it) |
| Rooftop metering for businesses | Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW |
| Modelled solar output | about 1,380 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 640 km from Ratlam in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Ratlam
In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.
The size limits, charges and other conditions for Madhya Pradesh are on the page Solar EPC Company in Madhya Pradesh.
In Ratlam the application for connection and metering goes to MPPaKVVCL.
What a plant produces in Ratlam
A solar plant in Ratlam is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HV-3.1), 11 kV supply energy charge of ₹7.79 per kWh (MPERC retail supply tariff order for FY 2026-27, Petition No. 140/2025, passed 26 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate of ₹7.79 per unit applies to energy up to 50% load factor; energy above 50% load factor is ₹6.79. A monthly fixed charge of ₹409 per kVA of billing demand also applies at 11 kV. At 33 kV the energy charge is ₹7.75 and ₹6.70, with a fixed charge of ₹641 per kVA. At 132 kV it is ₹7.34 and ₹6.35, with ₹729 per kVA. At 220/400 kV it is ₹6.89 and ₹5.89, with ₹729 per kVA. Time-of-day rebate or surcharge applies as set in the general terms of the HT tariff. A rebate of ₹1 per unit applies to new HT connections and, as an alternative, to incremental consumption of existing consumers, on the conditions in the order. The rates exclude taxes and duties. The same tariff order covers all three DISCOMs.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.79 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.8 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹53.8 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹1.08 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Ratlam: industrial areas
The Madhya Pradesh Industrial Development Corporation (MPIDC) land bank lists Mega Industrial Park Ratlam (Phase 01) and Industrial Park Ratlam among its industrial areas in Ratlam district.
The Government of India's One District One Product (ODOP) list names Ratlami Namkeen as the product of Ratlam district.
EPC projects by Somaya Solar near Ratlam
These are the Somaya Solar projects closest to Ratlam, with straight-line distances. They are shown as references and are not in Ratlam unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 550 km from Ratlam. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 700 km from Ratlam. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 710 km from Ratlam. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Ratlam
Which electricity company handles solar connections in Ratlam?
Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Ratlam district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Ratlam?
Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW. The rule is the same across Madhya Pradesh.
How much electricity does a solar plant generate in Ratlam?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Ratlam?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 640 km from Ratlam in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 550 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ratlam
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Energy Department, Govt of Madhya Pradesh: MP West Discom page
- GeoNames (place coordinates, CC BY 4.0)
- Invest MP / MPIDC: Madhya Pradesh Industrial Park Profiles & Land Bank 2023 (contents list)
- MPERC (Grid Interactive Renewable Energy Systems and Related Matters) Regulations [Revision II], 2024 {RG-39(II) of 2024}, dated 14 March 2024, with the First Amendment of 18 June 2026
- MPERC ARR and Retail Supply Tariff Order for FY 2026-27, 26 March 2026 (tariff schedule HV-3)
- Madhya Pradesh Electricity Regulatory Commission
- Madhya Pradesh Renewable Energy Policy 2025 (New and Renewable Energy Department, Government of Madhya Pradesh), clause 3.4
- Madhya Pradesh Renewable Energy Policy 2025 and Guidelines for its implementation (New and Renewable Energy Department, Government of Madhya Pradesh)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)