Jalaun at a glance for solar projects
| District and state | Jalaun district, Uttar Pradesh |
|---|---|
| Electricity supply | Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Jalaun district, one of the districts it lists as its area. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,400 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 340 km from Jalaun in a straight line |
Solar services in Jalaun
- Solar EPC Company in Jalaun
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Jalaun
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Jalaun
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Jalaun
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Jalaun
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Jalaun
One contract from survey to a working plant, with approvals and handover included.
Solar output in Jalaun
A solar plant in Jalaun is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.9 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹49.7 lakh |
| 1 MW | 14.0 lakh units | 10,000 sq m | ₹99.4 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Jalaun
For a rooftop array in Jalaun the strongest month is April, at about 144 units for each kW installed, and the weakest is July, at about 89. For a ground-mounted array at a 30° tilt the strongest month is March (about 148) and the weakest is July (about 81). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 112 | 138 |
| February | 117 | 134 |
| March | 140 | 148 |
| April | 144 | 139 |
| May | 144 | 131 |
| June | 118 | 105 |
| July | 89 | 81 |
| August | 92 | 87 |
| September | 103 | 104 |
| October | 121 | 135 |
| November | 109 | 132 |
| December | 108 | 136 |
Somaya Solar projects near Jalaun
These are the Somaya Solar projects closest to Jalaun, with straight-line distances. They are shown as references and are not in Jalaun unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 200 km from Jalaun. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 280 km from Jalaun. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 320 km from Jalaun. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Jalaun
Which electricity company handles solar connections in Jalaun?
Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Jalaun district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Jalaun?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Jalaun?
About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Jalaun?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 340 km from Jalaun in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 200 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Jalaun
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DVVNL official website, About Us page
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)
- e-Nagarsewa Uttar Pradesh portal (e-nagarsewaup.gov.in), ULB list: Nagar Palika Parishad