Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Jalesar, Uttar Pradesh.

Jalesar at a glance for solar projects

District and stateEtah district, Uttar Pradesh
Electricity supplyDakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Etah district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 160 km from Jalesar in a straight line

Solar services in Jalesar

Local points for solar projects in Jalesar

The Government of India's One District One Product (ODOP) list names Ankle Bells (Ghungroo), Bells and Brass Products as the product of Etah district.

Solar output in Jalesar

A solar plant in Jalesar is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹10.1 lakh
500 kW7.1 lakh units5,000 sq m₹50.4 lakh
1 MW14.2 lakh units10,000 sq m₹1.01 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Jalesar

For a rooftop array in Jalesar the strongest month is May, at about 147 units for each kW installed, and the weakest is July, at about 96. For a ground-mounted array at a 31° tilt the strongest month is March (about 149) and the weakest is July (about 87). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January111139
February116134
March140149
April145141
May147133
June124110
July9687
August9691
September105107
October123138
November109133
December107138

Somaya Solar projects near Jalesar

These are the Somaya Solar projects closest to Jalesar, with straight-line distances. They are shown as references and are not in Jalesar unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 160 km from Jalesar. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 160 km from Jalesar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 200 km from Jalesar. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Jalesar

Which electricity company handles solar connections in Jalesar?

Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Etah district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Jalesar?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Jalesar?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Jalesar?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Jalesar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 160 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jalesar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.