Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Jowai, Meghalaya. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Jowai at a glance for solar projects
| District and state | West Jaintia Hills district, Meghalaya |
|---|---|
| Electricity supply | Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies West Jaintia Hills district. |
| Electricity regulator | Meghalaya State Electricity Regulatory Commission (MSERC) |
| State renewable energy agency | Meghalaya New and Renewable Energy Development Agency (MNREDA) |
| State solar policy | Meghalaya Power Policy, 2024 (in force until 31 March 2030 unless notified otherwise) |
| Rooftop metering for businesses | Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW |
| Modelled solar output | about 1,190 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1500 km from Jowai in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Jowai
In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.
The size limits, charges and other conditions for Meghalaya are on the page Solar EPC Company in Meghalaya.
In Jowai the application for connection and metering goes to MePDCL.
What a plant produces in Jowai
A solar plant in Jowai is modelled to produce about 1,190 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.55 per kVAh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹6.6 lakh |
| 500 kW | 6.0 lakh units | 5,000 sq m | ₹33.0 lakh |
| 1 MW | 11.9 lakh units | 10,000 sq m | ₹66.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Jowai
The Government of India's One District One Product (ODOP) list names Turmeric (Lakadong) and Black Pottery (Khiew Ranei) as the products of West Jaintia Hills district.
EPC projects by Somaya Solar near Jowai
These are the Somaya Solar projects closest to Jowai, with straight-line distances. They are shown as references and are not in Jowai unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1210 km from Jowai. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1250 km from Jowai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1370 km from Jowai. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Jowai
Which electricity company handles solar connections in Jowai?
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies West Jaintia Hills district.
Is net metering available for factories and commercial buildings in Jowai?
Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.
How much electricity does a solar plant generate in Jowai?
About 1,190 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Jowai?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1500 km from Jowai in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1210 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Jowai
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026, notification of 30 April 2026; MSERC public notice of 1 October 2026
- MSERC order in Case No. 11 of 2025, MePDCL revised ARR and distribution tariff for FY 2026-27, dated 26 March 2026 (section 9.2.4 and the table of approved tariffs)
- MSERC order, Case No. 11 of 2025 (MePDCL, FY 2026-27, 26 March 2026)
- Meghalaya New And Renewable Energy Development Agency (State Nodal Agency for MNRE); MSERC DRE Regulations, 2026 preamble
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- Meghalaya State Electricity Regulatory Commission
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)