Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Kakinada, Andhra Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Kakinada: industrial areas
APIIC, the Andhra Pradesh Industrial Infrastructure Corporation, lists Apiic_Kakinada_Ph3_Ip, Cc_Kakinada, Ida,Kakinada(Expansion), Ida-Kakinada, Ihc_Kakinada, Ip-Kakinada Expn.Phase-Ii, Mie_Kakinada and Seie-Kakinada among its industrial areas in Kakinada district.
The Government of India's One District One Product (ODOP) list names Uppada Jamdani Sarees, Peddapuram Silk Dhotis, Upper and shirtings, Kalamkari Block Printing and Cashew Kernel as the products of Kakinada district.
Metering rules for business rooftops in Kakinada
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
The size limits, charges and other conditions for Andhra Pradesh are on the page Commercial & Industrial Solar in Andhra Pradesh.
In Kakinada the application for connection and metering goes to APEPDCL.
Output and bill value for a rooftop plant in Kakinada
A solar plant in Kakinada is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (General), HT-III(A), 11 kV supply energy charge of ₹6.30 per kVAh (APERC retail supply tariff order for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is for normal hours (3 PM to 6 PM and 10 PM to midnight). The table shows the billing unit as kWh/kVAh. Time-of-day rates apply: in 11 kV supply, off-peak (10 AM to 3 PM and midnight to 6 AM) is ₹5.55. Peak (6 AM to 10 AM and 6 PM to 10 PM) is ₹7.80 in the high-demand months (April and May, September and October, February and March) and ₹7.30 in the other months. Normal-hour rates at other voltages: ₹5.85 at 33 kV, ₹5.40 at 132 kV and ₹5.35 at 220 kV. A demand charge of ₹475 per kVA per month also applies. The tariff excludes electricity duty, fuel and power purchase cost adjustment (FPPCA), true-up and other recoveries. The same schedule applies to APSPDCL, APCPDCL and APEPDCL.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.30 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.6 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹21.6 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹43.2 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹86.3 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Kakinada
These are the Somaya Solar projects closest to Kakinada, with straight-line distances. They are shown as references and are not in Kakinada unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1240 km from Kakinada. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1400 km from Kakinada. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1500 km from Kakinada. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Kakinada
Which electricity company handles solar connections in Kakinada?
Andhra Pradesh Eastern Power Distribution Company Limited (APEPDCL) supplies electricity in Kakinada district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kakinada?
Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.
How much electricity does a solar plant generate in Kakinada?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kakinada?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1390 km from Kakinada in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1240 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kakinada
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APEPDCL website, district map (contacts menu)
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XI, Table 11)
- APIIC, List of APIIC Industrial Parks, Undeveloped Lands (UDL) & Private Industrial Parks in Andhra Pradesh
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)