Somaya Solar Solutions Limited delivers turnkey solar projects in Kakinada, Andhra Pradesh: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Kakinada
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (APEPDCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Kakinada
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
The size limits, charges and other conditions for Andhra Pradesh are on the page Turnkey Solar EPC in Andhra Pradesh.
In Kakinada the application for connection and metering goes to APEPDCL.
What to expect from the plant in Kakinada
A solar plant in Kakinada is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (General), HT-III(A), 11 kV supply energy charge of ₹6.30 per kVAh (APERC retail supply tariff order for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is for normal hours (3 PM to 6 PM and 10 PM to midnight). The table shows the billing unit as kWh/kVAh. Time-of-day rates apply: in 11 kV supply, off-peak (10 AM to 3 PM and midnight to 6 AM) is ₹5.55. Peak (6 AM to 10 AM and 6 PM to 10 PM) is ₹7.80 in the high-demand months (April and May, September and October, February and March) and ₹7.30 in the other months. Normal-hour rates at other voltages: ₹5.85 at 33 kV, ₹5.40 at 132 kV and ₹5.35 at 220 kV. A demand charge of ₹475 per kVA per month also applies. The tariff excludes electricity duty, fuel and power purchase cost adjustment (FPPCA), true-up and other recoveries. The same schedule applies to APSPDCL, APCPDCL and APEPDCL.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.30 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.6 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹43.2 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹86.3 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Kakinada
These are the Somaya Solar projects closest to Kakinada, with straight-line distances. They are shown as references and are not in Kakinada unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 790 km from Kakinada. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1240 km from Kakinada. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1380 km from Kakinada. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kakinada
Which electricity company handles solar connections in Kakinada?
Andhra Pradesh Eastern Power Distribution Company Limited (APEPDCL) supplies electricity in Kakinada district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kakinada?
Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.
How much electricity does a solar plant generate in Kakinada?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kakinada?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1390 km from Kakinada in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 790 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kakinada
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APEPDCL website, district map (contacts menu)
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XI, Table 11)
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)