Somaya Solar Solutions Limited builds ground-mounted solar power plants in Kallakurichi, Tamil Nadu for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Kallakurichi
A solar plant in Kallakurichi is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (13°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 13.4 lakh units | 4 to 5 acres |
| 2 MW | 26.8 lakh units | 8 to 10 acres |
| 5 MW | 67.0 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Tamil Nadu
Under TNERC's Green Energy Open Access Regulations, 2025 (notified 18 September 2025), any EHT or HT consumer with a contracted demand of 63 kVA or more can take renewable power through open access.
The charges, exemptions and conditions for Tamil Nadu are on the page Ground-Mounted Solar Plant in Tamil Nadu.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Kallakurichi
These are the Somaya Solar projects closest to Kallakurichi, with straight-line distances. They are shown as references and are not in Kallakurichi unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1350 km from Kallakurichi. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1910 km from Kallakurichi. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kallakurichi
Which electricity company handles solar connections in Kallakurichi?
Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Kallakurichi district.
How much electricity does a solar plant generate in Kallakurichi?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kallakurichi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1890 km from Kallakurichi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1350 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kallakurichi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Terms and Conditions for Green Energy Open Access) Regulations, 2025, notification of 18 September 2025; TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025 (TNPDCL, FY 2025-26, effective 1 July 2025)
- TNPDCL profile page