Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Karanja, Maharashtra as an EPC contractor: engineering, supply, construction and commissioning.
What Maharashtra's policy says about large solar plants
The Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36 is the state's current policy for grid-connected renewable energy and energy storage. The state government approved it by a Government Resolution dated 18 March 2026. It is in force until 31 March 2036 and replaces the 2020 policy, but projects already under construction or operating under the 2015 and 2020 policies stay under those policies.
Under MERC's Distribution Open Access Regulations, 2016, as amended on 10 November 2023 to bring in the central Green Energy Open Access Rules, a consumer with a contract demand or sanctioned load of 100 kW or more can take green power through open access. In MSEDCL's area, connections in the same electricity circle can be added together to reach 100 kW. There is no load limit for captive consumers.
The charges, exemptions and conditions for Maharashtra are on the page Utility-Scale Solar in Maharashtra.
Output and land at megawatt scale in Karanja
A solar plant in Karanja is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (26°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 70.5 lakh units | 20 to 25 acres |
| 10 MW | 1.41 crore units | 40 to 50 acres |
| 25 MW | 3.52 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Karanja
These are the Somaya Solar projects closest to Karanja, with straight-line distances. They are shown as references and are not in Karanja unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 480 km from Karanja. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 940 km from Karanja. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Karanja
Which electricity company handles solar connections in Karanja?
Maharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Washim district.
How much electricity does a solar plant generate in Karanja?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Karanja?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 910 km from Karanja in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 480 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Karanja
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- MERC (Distribution Open Access) (Second Amendment) Regulations, 2023, dated 10 November 2023; MERC order of 25 March 2026 in Case No. 75 of 2025 (Annexure III and paragraph 18.21); MERC MYT order of 28 March 2025 in Case No. 217 of 2024 (paragraph 7.36.28)
- MSEDCL company profile
- Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, Government Resolution No. अपाऊ-2025/प्र.क्र.22/ऊर्जा-7 dated 18 March 2026; Energy Department FAQ on the policy, version 3.0, October 2026 (both on the MEDA website)
- PVGIS, European Commission Joint Research Centre (solar output model)