Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kheri, Uttar Pradesh.
Kheri at a glance for solar projects
| District and state | Lakhimpur Kheri district, Uttar Pradesh |
|---|---|
| Electricity supply | Madhyanchal Vidyut Vitran Nigam Limited (MVVNL) supplies electricity in Lakhimpur Kheri district, one of the districts it lists as its area. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,380 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 340 km from Kheri in a straight line |
Solar services in Kheri
- Solar EPC Company in Kheri
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Kheri
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Kheri
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Kheri
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Kheri
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Kheri
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Kheri
The Government of India's One District One Product (ODOP) list names Tribal craft and Jaggery Products as the products of Lakhimpur Kheri district.
Solar output in Kheri
A solar plant in Kheri is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.8 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹49.0 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹98.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Kheri
For a rooftop array in Kheri the strongest month is May, at about 145 units for each kW installed, and the weakest is July, at about 90. For a ground-mounted array at a 32° tilt the strongest month is March (about 150) and the weakest is July (about 82). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 108 | 136 |
| February | 113 | 132 |
| March | 140 | 150 |
| April | 144 | 140 |
| May | 145 | 131 |
| June | 120 | 106 |
| July | 90 | 82 |
| August | 94 | 89 |
| September | 100 | 102 |
| October | 117 | 133 |
| November | 108 | 135 |
| December | 104 | 135 |
Somaya Solar projects near Kheri
These are the Somaya Solar projects closest to Kheri, with straight-line distances. They are shown as references and are not in Kheri unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 90 km from Kheri. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 230 km from Kheri. Completed in two months, with five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 250 km from Kheri. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kheri
Which electricity company handles solar connections in Kheri?
Madhyanchal Vidyut Vitran Nigam Limited (MVVNL) supplies electricity in Lakhimpur Kheri district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kheri?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Kheri?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kheri?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 340 km from Kheri in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 90 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kheri
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MVVNL official website, About MVVNL page
- PVGIS, European Commission Joint Research Centre (solar output model)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)
- e-Nagarsewa Uttar Pradesh portal (e-nagarsewaup.gov.in), ULB list: Nagar Panchayat