Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Khliehriat, Meghalaya. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Khliehriat

The Government of India's One District One Product (ODOP) list names Turmeric as the product of East Jaintia Hills district.

Metering rules for business rooftops in Khliehriat

In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.

The size limits, charges and other conditions for Meghalaya are on the page Commercial & Industrial Solar in Meghalaya.

In Khliehriat the application for connection and metering goes to MePDCL.

Output and bill value for a rooftop plant in Khliehriat

A solar plant in Khliehriat is modelled to produce about 1,200 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.55 per kVAh
100 kW1.2 lakh units1,000 sq m₹6.7 lakh
250 kW3.0 lakh units2,500 sq m₹16.6 lakh
500 kW6.0 lakh units5,000 sq m₹33.3 lakh
1 MW12.0 lakh units10,000 sq m₹66.6 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Khliehriat

These are the Somaya Solar projects closest to Khliehriat, with straight-line distances. They are shown as references and are not in Khliehriat unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1270 km from Khliehriat. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1390 km from Khliehriat. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1490 km from Khliehriat. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Khliehriat

Which electricity company handles solar connections in Khliehriat?

Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Jaintia Hills district.

Is net metering available for factories and commercial buildings in Khliehriat?

Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.

How much electricity does a solar plant generate in Khliehriat?

About 1,200 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Khliehriat?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1520 km from Khliehriat in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1270 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Khliehriat

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition