Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Shillong, Meghalaya. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Shillong
The Government of India's One District One Product (ODOP) list names Khasi Mandarin (Orange) and Cane & Bamboo Handicrafts as the products of East Khasi Hills district.
Metering rules for business rooftops in Shillong
In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.
The size limits, charges and other conditions for Meghalaya are on the page Commercial & Industrial Solar in Meghalaya.
In Shillong the application for connection and metering goes to MePDCL.
Output and bill value for a rooftop plant in Shillong
A solar plant in Shillong is modelled to produce about 1,170 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.55 per kVAh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹6.5 lakh |
| 250 kW | 2.9 lakh units | 2,500 sq m | ₹16.2 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹32.5 lakh |
| 1 MW | 11.7 lakh units | 10,000 sq m | ₹64.9 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Shillong
These are the Somaya Solar projects closest to Shillong, with straight-line distances. They are shown as references and are not in Shillong unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1220 km from Shillong. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1340 km from Shillong. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1430 km from Shillong. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Shillong
Which electricity company handles solar connections in Shillong?
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Khasi Hills district.
Is net metering available for factories and commercial buildings in Shillong?
Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.
How much electricity does a solar plant generate in Shillong?
About 1,170 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Shillong?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1470 km from Shillong in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1220 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Shillong
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026, notification of 30 April 2026; MSERC public notice of 1 October 2026
- MSERC order in Case No. 11 of 2025, MePDCL revised ARR and distribution tariff for FY 2026-27, dated 26 March 2026 (section 9.2.4 and the table of approved tariffs)
- MSERC order, Case No. 11 of 2025 (MePDCL, FY 2026-27, 26 March 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)