Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Shillong, Meghalaya.
Shillong at a glance for solar projects
| District and state | East Khasi Hills district, Meghalaya |
|---|---|
| Electricity supply | Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Khasi Hills district. |
| Electricity regulator | Meghalaya State Electricity Regulatory Commission (MSERC) |
| State renewable energy agency | Meghalaya New and Renewable Energy Development Agency (MNREDA) |
| State solar policy | Meghalaya Power Policy, 2024 (in force until 31 March 2030 unless notified otherwise) |
| Rooftop metering for businesses | Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW |
| Modelled solar output | about 1,170 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1470 km from Shillong in a straight line |
Solar services in Shillong
- Solar EPC Company in Shillong
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Shillong
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Shillong
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Shillong
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Shillong
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Shillong
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Shillong
The Government of India's One District One Product (ODOP) list names Khasi Mandarin (Orange) and Cane & Bamboo Handicrafts as the products of East Khasi Hills district.
Solar output in Shillong
A solar plant in Shillong is modelled to produce about 1,170 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.55 per kVAh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹6.5 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹32.5 lakh |
| 1 MW | 11.7 lakh units | 10,000 sq m | ₹64.9 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Shillong
For a rooftop array in Shillong the strongest month is March, at about 124 units for each kW installed, and the weakest is June, at about 78. For a ground-mounted array at a 33° tilt the strongest month is January (about 132) and the weakest is June (about 69). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 107 | 132 |
| February | 105 | 121 |
| March | 124 | 130 |
| April | 114 | 108 |
| May | 103 | 92 |
| June | 78 | 69 |
| July | 79 | 70 |
| August | 80 | 75 |
| September | 84 | 84 |
| October | 97 | 107 |
| November | 100 | 121 |
| December | 100 | 126 |
Somaya Solar projects near Shillong
These are the Somaya Solar projects closest to Shillong, with straight-line distances. They are shown as references and are not in Shillong unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1180 km from Shillong. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1220 km from Shillong. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1340 km from Shillong. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Shillong
Which electricity company handles solar connections in Shillong?
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Khasi Hills district.
Is net metering available for factories and commercial buildings in Shillong?
Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.
How much electricity does a solar plant generate in Shillong?
About 1,170 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Shillong?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1470 km from Shillong in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1180 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Shillong
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026, notification of 30 April 2026; MSERC public notice of 1 October 2026
- MSERC order in Case No. 11 of 2025, MePDCL revised ARR and distribution tariff for FY 2026-27, dated 26 March 2026 (section 9.2.4 and the table of approved tariffs)
- MSERC order, Case No. 11 of 2025 (MePDCL, FY 2026-27, 26 March 2026)
- Meghalaya New And Renewable Energy Development Agency (State Nodal Agency for MNRE); MSERC DRE Regulations, 2026 preamble
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- Meghalaya State Electricity Regulatory Commission
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)