Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kichha, Uttarakhand.

Kichha at a glance for solar projects

District and stateUdham Singh Nagar district, Uttarakhand
Electricity supplyUttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Udham Singh Nagar district.
Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,380 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 200 km from Kichha in a straight line

Solar services in Kichha

Local points for solar projects in Kichha

The Government of India's One District One Product (ODOP) list names Moonj Grass product as the product of Udham Singh Nagar district.

Solar output in Kichha

A solar plant in Kichha is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.5 lakh
500 kW6.9 lakh units5,000 sq m₹47.3 lakh
1 MW13.8 lakh units10,000 sq m₹94.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Kichha

For a rooftop array in Kichha the strongest month is May, at about 144 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 33° tilt the strongest month is March (about 148) and the weakest is July (about 79). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January107137
February111131
March138148
April142139
May144130
June122107
July8879
August9287
September103106
October119137
November107136
December104137

Somaya Solar projects near Kichha

These are the Somaya Solar projects closest to Kichha, with straight-line distances. They are shown as references and are not in Kichha unless the line says so.

  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 60 km from Kichha. Completed in two months, with five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 100 km from Kichha. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 120 km from Kichha. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.

See all published projects

Questions about solar projects in Kichha

Which electricity company handles solar connections in Kichha?

Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Udham Singh Nagar district.

Is net metering available for factories and commercial buildings in Kichha?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much electricity does a solar plant generate in Kichha?

About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Kichha?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 200 km from Kichha in a straight line. The closest published project is Naini Papers Limited (3 MW rooftop plant) in Kashipur, about 60 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kichha

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.