Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Kozhikode, Kerala as an EPC contractor: engineering, supply, construction and commissioning.
What Kerala's policy says about large solar plants
The Kerala Solar Energy Policy, 2013 is the solar policy that ANERT lists on its website. It says it stays in force until another policy supersedes or changes it. It is an old policy, and the 2025 regulations of the state regulator now set the metering, banking and captive rules. A draft Kerala Power Policy, 2025 has been published for discussion but is only a draft.
In Kerala, open access is granted under KSERC's Connectivity and Intra-State Open Access Regulations, 2013 to consumers whose maximum power exceeds 100 kW. The 2025 renewable energy regulations say open access charges and surcharges follow those regulations and the tariff orders. The charges below are from the tariff schedule that runs from 5 December 2024 to 31 March 2027.
The charges, exemptions and conditions for Kerala are on the page Utility-Scale Solar in Kerala.
Output and land at megawatt scale in Kozhikode
A solar plant in Kozhikode is modelled to produce about 1,260 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (18°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 63.0 lakh units | 20 to 25 acres |
| 10 MW | 1.26 crore units | 40 to 50 acres |
| 25 MW | 3.15 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Kozhikode
These are the Somaya Solar projects closest to Kozhikode, with straight-line distances. They are shown as references and are not in Kozhikode unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1480 km from Kozhikode. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1980 km from Kozhikode. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kozhikode
Which electricity company handles solar connections in Kozhikode?
KSEB Ltd, the state electricity board company, supplies Kozhikode district outside the small areas held by special licensees such as industrial parks.
How much electricity does a solar plant generate in Kozhikode?
About 1,260 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.6 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kozhikode?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1940 km from Kozhikode in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1480 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kozhikode
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- KSERC order of 21 May 2026 in OP 63/2025 (KSEB Ltd true-up), para 5.1
- KSERC schedule of tariff and terms and conditions for retail supply, 5 December 2024 to 31 March 2027 (Part D); KSERC (Renewable Energy and Related Matters) Regulations, 2025, regulations 20, 33 and 34
- Kerala Solar Energy Policy 2013 (G.O.(P) No. 49/2013/PD, 25 November 2013), as published by ANERT
- PVGIS, European Commission Joint Research Centre (solar output model)