What Haryana's policy says about large solar plants

The Haryana Solar Power Policy, 2016 is the state's notified solar policy. It came into force on 14 March 2016 and stays in force until a new policy is notified. The state published a draft Haryana Solar Power Policy, 2023 for public comments, but the state agency's policy page still lists it as a draft.

Under Haryana's Green Energy Open Access Regulations, 2023, as amended on 25 February 2025, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the same operation division of a distribution company.

The charges, exemptions and conditions for Haryana are on the page Utility-Scale Solar in Haryana.

Output and land at megawatt scale in Kundli

A solar plant in Kundli is modelled to produce about 1,510 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).

Plant sizeModelled output a yearLand needed (typical)
5 MW75.5 lakh units20 to 25 acres
10 MW1.51 crore units40 to 50 acres
25 MW3.77 crore units100 to 125 acres

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Megawatt-scale ground-mounted work by Somaya Solar near Kundli

These are the Somaya Solar projects closest to Kundli, with straight-line distances. They are shown as references and are not in Kundli unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 130 km from Kundli. In progress. Site access was difficult and was handled with local support.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 650 km from Kundli. Completed, including the transmission line work coordinated with the local distribution company.

See all published projects

Questions about solar projects in Kundli

Which electricity company handles solar connections in Kundli?

Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Sonipat district, one of the districts it lists as its area.

How much electricity does a solar plant generate in Kundli?

About 1,510 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.1 lakh units a year. A site study gives the figure to plan on.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based, and how far is that from Kundli?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Kundli in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 130 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kundli

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image