Somaya Solar Solutions Limited delivers turnkey solar projects in Lawngtlai, Mizoram: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Lawngtlai

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (P&ED) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Lawngtlai

In Mizoram, rooftop solar falls under the JERC for Manipur and Mizoram (Metering for Grid Connected Renewable Energy) Regulations, 2016, as amended in 2016, 2022 and twice in 2023. MZERC adopted them on 26 July 2024, from 23 July 2024, and the 2026 MZERC orders still apply them.

The size limits, charges and other conditions for Mizoram are on the page Turnkey Solar EPC in Mizoram.

In Lawngtlai the application for connection and metering goes to P&ED.

What to expect from the plant in Lawngtlai

A solar plant in Lawngtlai is modelled to produce about 1,300 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Service (HT Industrial), Option-1 energy charge of ₹9.05 per kVAh (MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹80 per kVA of billing demand per month also applies. Option-2 time-of-day rates per kVAh: ₹9.05 from 6 AM to 5 PM, ₹11.40 from 5 to 10 PM and ₹7.05 from 10 PM to 6 AM; it starts only when P&ED has the metering and billing system ready. These are the subsidised rates. If the state government's monthly subsidy is not paid in advance, P&ED may bill the full cost tariff, which is ₹9.68 per kVAh for HT Industrial Option-1. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.05 per kVAh
100 kW1.3 lakh units1,000 sq m₹11.8 lakh
500 kW6.5 lakh units5,000 sq m₹58.8 lakh
1 MW13.0 lakh units10,000 sq m₹1.18 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Lawngtlai

These are the Somaya Solar projects closest to Lawngtlai, with straight-line distances. They are shown as references and are not in Lawngtlai unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1290 km from Lawngtlai. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1430 km from Lawngtlai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1580 km from Lawngtlai. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Lawngtlai

Which electricity company handles solar connections in Lawngtlai?

Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Lawngtlai district.

Is net metering available for factories and commercial buildings in Lawngtlai?

Net metering up to 10 kW; gross metering above that, up to 1 MWp. The rule is the same across Mizoram.

How much electricity does a solar plant generate in Lawngtlai?

About 1,300 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Lawngtlai?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1690 km from Lawngtlai in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1290 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Lawngtlai

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.