Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Mizoram.
Mizoram at a glance for solar projects
| Electricity regulator | Mizoram Electricity Regulatory Commission (MZERC) |
|---|---|
| State renewable energy agency | Power & Electricity Department, Government of Mizoram (P&ED) |
| Electricity distribution | P&ED (The whole state of Mizoram, including Aizawl and Lunglei) |
| State solar policy | Solar Power Policy of Mizoram, 2025 (notified 25 February 2025; in force until a new policy replaces it) |
| Rooftop metering for businesses | Net metering up to 10 kW; gross metering above that, up to 1 MWp |
Solar services in Mizoram
- Solar EPC Company in Mizoram
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Mizoram
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Mizoram
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Mizoram
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Mizoram
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Mizoram
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Mizoram
Solar output changes across Mizoram with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,260 to 1,300 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Aizawl | 1,280 | 1,340 |
| Hnahthial | 1,290 | 1,340 |
| Khawzawl | 1,300 | 1,350 |
| Kolasib | 1,260 | 1,320 |
| Lawngtlai | 1,300 | 1,350 |
| Lunglei | 1,280 | 1,330 |
| Saiha | 1,290 | 1,340 |
| Saitual | 1,290 | 1,340 |
| Serchhip | 1,290 | 1,350 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Mizoram
Questions about solar projects in Mizoram
Is net metering available for factories and commercial buildings in Mizoram?
In Mizoram, rooftop solar falls under the JERC for Manipur and Mizoram (Metering for Grid Connected Renewable Energy) Regulations, 2016, as amended in 2016, 2022 and twice in 2023. MZERC adopted them on 26 July 2024, from 23 July 2024, and the 2026 MZERC orders still apply them.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mizoram
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- JERC for Manipur and Mizoram (Metering for Grid Connected Renewable Energy) Regulations, 2016, with amendments of 2016, 2022 and 2023, adopted by MZERC on 26 July 2024; MZERC order of 11 May 2026 on APPC for rooftop solar
- MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026 (paragraph 1 of the order)
- Mizoram Electricity Regulatory Commission (MZERC), functional from 23 July 2024; before that the Joint Electricity Regulatory Commission for Manipur and Mizoram
- PVGIS, European Commission Joint Research Centre (solar output model)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, Government of Mizoram; Mizoram Gazette Extraordinary, 28 February 2025)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, notified 25 February 2025): the Department is the State Nodal Agency, and the Zoram Energy Development Agency (ZEDA) implements rooftop solar