Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Aizawl, Mizoram.

Aizawl at a glance for solar projects

District and stateAizawl district, Mizoram
Electricity supplyPower & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Aizawl district.
Electricity regulatorMizoram Electricity Regulatory Commission (MZERC)
State renewable energy agencyPower & Electricity Department, Government of Mizoram (P&ED)
State solar policySolar Power Policy of Mizoram, 2025 (notified 25 February 2025; in force until a new policy replaces it)
Rooftop metering for businessesNet metering up to 10 kW; gross metering above that, up to 1 MWp
Modelled solar outputabout 1,280 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1620 km from Aizawl in a straight line

Solar services in Aizawl

Local points for solar projects in Aizawl

The Government of India's One District One Product (ODOP) list names Dragon Fruit as the product of Aizawl district.

Solar output in Aizawl

A solar plant in Aizawl is modelled to produce about 1,280 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Service (HT Industrial), Option-1 energy charge of ₹9.05 per kVAh (MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹80 per kVA of billing demand per month also applies. Option-2 time-of-day rates per kVAh: ₹9.05 from 6 AM to 5 PM, ₹11.40 from 5 to 10 PM and ₹7.05 from 10 PM to 6 AM; it starts only when P&ED has the metering and billing system ready. These are the subsidised rates. If the state government's monthly subsidy is not paid in advance, P&ED may bill the full cost tariff, which is ₹9.68 per kVAh for HT Industrial Option-1. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.05 per kVAh
100 kW1.3 lakh units1,000 sq m₹11.6 lakh
500 kW6.4 lakh units5,000 sq m₹57.9 lakh
1 MW12.8 lakh units10,000 sq m₹1.16 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Aizawl

For a rooftop array in Aizawl the strongest month is March, at about 134 units for each kW installed, and the weakest is July, at about 83. For a ground-mounted array at a 30° tilt the strongest month is January (about 144) and the weakest is July (about 76). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January120144
February117132
March134140
April127122
May117106
June8879
July8376
August8681
September9292
October101109
November105123
December109133

Somaya Solar projects near Aizawl

These are the Somaya Solar projects closest to Aizawl, with straight-line distances. They are shown as references and are not in Aizawl unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1250 km from Aizawl. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1360 km from Aizawl. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1500 km from Aizawl. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Aizawl

Which electricity company handles solar connections in Aizawl?

Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Aizawl district.

Is net metering available for factories and commercial buildings in Aizawl?

Net metering up to 10 kW; gross metering above that, up to 1 MWp. The rule is the same across Mizoram.

How much electricity does a solar plant generate in Aizawl?

About 1,280 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Aizawl?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1620 km from Aizawl in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1250 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Aizawl

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image