Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Hnahthial, Mizoram.
Hnahthial at a glance for solar projects
| District and state | Hnahthial district, Mizoram |
|---|---|
| Electricity supply | Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Hnahthial district. |
| Electricity regulator | Mizoram Electricity Regulatory Commission (MZERC) |
| State renewable energy agency | Power & Electricity Department, Government of Mizoram (P&ED) |
| State solar policy | Solar Power Policy of Mizoram, 2025 (notified 25 February 2025; in force until a new policy replaces it) |
| Rooftop metering for businesses | Net metering up to 10 kW; gross metering above that, up to 1 MWp |
| Modelled solar output | about 1,290 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1670 km from Hnahthial in a straight line |
Solar services in Hnahthial
- Solar EPC Company in Hnahthial
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Hnahthial
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Hnahthial
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Hnahthial
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Hnahthial
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Hnahthial
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Hnahthial
The Government of India's One District One Product (ODOP) list names Mizo Chilli as the product of Hnahthial district.
Solar output in Hnahthial
A solar plant in Hnahthial is modelled to produce about 1,290 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Service (HT Industrial), Option-1 energy charge of ₹9.05 per kVAh (MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹80 per kVA of billing demand per month also applies. Option-2 time-of-day rates per kVAh: ₹9.05 from 6 AM to 5 PM, ₹11.40 from 5 to 10 PM and ₹7.05 from 10 PM to 6 AM; it starts only when P&ED has the metering and billing system ready. These are the subsidised rates. If the state government's monthly subsidy is not paid in advance, P&ED may bill the full cost tariff, which is ₹9.68 per kVAh for HT Industrial Option-1. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹9.05 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹11.7 lakh |
| 500 kW | 6.5 lakh units | 5,000 sq m | ₹58.4 lakh |
| 1 MW | 12.9 lakh units | 10,000 sq m | ₹1.17 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Hnahthial
For a rooftop array in Hnahthial the strongest month is March, at about 138 units for each kW installed, and the weakest is July, at about 82. For a ground-mounted array at a 29° tilt the strongest month is March (about 144) and the weakest is July (about 76). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 121 | 143 |
| February | 119 | 133 |
| March | 138 | 144 |
| April | 131 | 127 |
| May | 119 | 110 |
| June | 87 | 80 |
| July | 82 | 76 |
| August | 84 | 81 |
| September | 91 | 92 |
| October | 99 | 106 |
| November | 106 | 122 |
| December | 110 | 131 |
Somaya Solar projects near Hnahthial
These are the Somaya Solar projects closest to Hnahthial, with straight-line distances. They are shown as references and are not in Hnahthial unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1280 km from Hnahthial. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1420 km from Hnahthial. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1560 km from Hnahthial. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Hnahthial
Which electricity company handles solar connections in Hnahthial?
Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Hnahthial district.
Is net metering available for factories and commercial buildings in Hnahthial?
Net metering up to 10 kW; gross metering above that, up to 1 MWp. The rule is the same across Mizoram.
How much electricity does a solar plant generate in Hnahthial?
About 1,290 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Hnahthial?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1670 km from Hnahthial in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1280 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Hnahthial
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- JERC for Manipur and Mizoram (Metering for Grid Connected Renewable Energy) Regulations, 2016, with amendments of 2016, 2022 and 2023, adopted by MZERC on 26 July 2024; MZERC order of 11 May 2026 on APPC for rooftop solar
- MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026 (tariff schedule, HT Category 6 Industrial Service; Tables 8.2 and 8.3)
- MZERC tariff order for P&ED, FY 2026-27 (25 March 2026), para 1
- Mizoram Electricity Regulatory Commission (MZERC), functional from 23 July 2024; before that the Joint Electricity Regulatory Commission for Manipur and Mizoram
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, Government of Mizoram; Mizoram Gazette Extraordinary, 28 February 2025)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, notified 25 February 2025): the Department is the State Nodal Agency, and the Zoram Energy Development Agency (ZEDA) implements rooftop solar