Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Hnahthial, Mizoram and what we do on such a project.

What PM-KUSUM covers

PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components. The three parts of the scheme are set out on our PM-KUSUM page.

Who runs PM-KUSUM in Mizoram

The Lok Sabha answer reports solar pumps under PM-KUSUM Component B in Mizoram, and nothing under Component A or Component C.

The targets, tariffs and application details for Mizoram are on the page PM-KUSUM in Mizoram.

For land or pumps in Hnahthial, the electricity supplier is the one to check first: Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Hnahthial district.

What a PM-KUSUM plant produces in Hnahthial

A solar plant in Hnahthial is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (29°).

Plant sizeModelled output a yearLand needed (typical)
500 kW6.7 lakh units2 to 2.5 acres
1 MW13.4 lakh units4 to 5 acres
2 MW26.8 lakh units8 to 10 acres

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What Somaya Solar does on a PM-KUSUM plant

Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.

  • Site check of the land and its distance from the substation
  • Plant design and equipment supply
  • Installation, testing and commissioning
  • The line to the substation and coordination with the electricity supplier
  • Support with the documents the implementing agency asks for

More detail: PM-KUSUM across India.

PM-KUSUM plants built by Somaya Solar

These are the Somaya Solar projects closest to Hnahthial, with straight-line distances. They are shown as references and are not in Hnahthial unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1280 km from Hnahthial. Completed, including the transmission line work coordinated with the local distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1590 km from Hnahthial. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Hnahthial

Which electricity company handles solar connections in Hnahthial?

Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Hnahthial district.

How much electricity does a solar plant generate in Hnahthial?

About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.

Who do I apply to for PM-KUSUM in Mizoram?

The Lok Sabha answer reports solar pumps under PM-KUSUM Component B in Mizoram, and nothing under Component A or Component C.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based, and how far is that from Hnahthial?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1670 km from Hnahthial in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1280 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Hnahthial

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image