Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Dharmanagar, Tripura.
Dharmanagar at a glance for solar projects
| District and state | North Tripura district, Tripura |
|---|---|
| Electricity supply | Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies North Tripura district. |
| Electricity regulator | Tripura Electricity Regulatory Commission (TERC) |
| State renewable energy agency | Tripura Renewable Energy Development Agency (TREDA) |
| Rooftop metering for businesses | Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users |
| Modelled solar output | about 1,230 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1540 km from Dharmanagar in a straight line |
Solar services in Dharmanagar
- Solar EPC Company in Dharmanagar
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Dharmanagar
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Dharmanagar
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Dharmanagar
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Dharmanagar
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Dharmanagar
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Dharmanagar
The Government of India's One District One Product (ODOP) list names Agar Products as the product of North Tripura district.
Solar output in Dharmanagar
A solar plant in Dharmanagar is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, above 100 HP energy charge of ₹8.34 per kWh (TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is split by connected horsepower, not by voltage. A fixed charge of ₹280 per kW per month also applies. Time-of-day billing: energy charges are 80% of the normal rate from 9 AM to 5 PM and 140% from 5 PM to 10 PM for industrial users, and normal from 10 PM to 9 AM. A 3% rebate on the bill applies for payment within 5 working days. Bulk Supply is ₹8.66 per kWh with ₹210 per kW per month fixed. The rates exclude taxes and duties. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.34 per kWh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹10.3 lakh |
| 500 kW | 6.2 lakh units | 5,000 sq m | ₹51.3 lakh |
| 1 MW | 12.3 lakh units | 10,000 sq m | ₹1.03 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Dharmanagar
For a rooftop array in Dharmanagar the strongest month is March, at about 127 units for each kW installed, and the weakest is June, at about 87. For a ground-mounted array at a 30° tilt the strongest month is January (about 135) and the weakest is June (about 78). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 112 | 135 |
| February | 110 | 125 |
| March | 127 | 132 |
| April | 115 | 111 |
| May | 106 | 97 |
| June | 87 | 78 |
| July | 88 | 80 |
| August | 89 | 84 |
| September | 91 | 91 |
| October | 98 | 107 |
| November | 101 | 120 |
| December | 103 | 126 |
Somaya Solar projects near Dharmanagar
These are the Somaya Solar projects closest to Dharmanagar, with straight-line distances. They are shown as references and are not in Dharmanagar unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1200 km from Dharmanagar. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1280 km from Dharmanagar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1420 km from Dharmanagar. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Dharmanagar
Which electricity company handles solar connections in Dharmanagar?
Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies North Tripura district.
Is net metering available for factories and commercial buildings in Dharmanagar?
Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users. The rule is the same across Tripura.
How much electricity does a solar plant generate in Dharmanagar?
About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dharmanagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1540 km from Dharmanagar in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1200 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dharmanagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (Tripura Gazette, 5 July 2024), First Amendment Regulations, 2025 (notified 18 December 2025); TERC draft Second Amendment of 16 October 2026
- TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026 (tariff schedule, category H Industrial)
- TERC tariff order for TSECL, FY 2026-27 (4 May 2026), para 1.1.1
- Tripura Electricity Regulatory Commission
- Tripura Renewable Energy Development Agency (TREDA), a constituent organisation of the Department of Power, Government of Tripura; TREDA notice of 23 April 2025 on PM-KUSUM Component A