Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Tripura.
Tripura at a glance for solar projects
| Electricity regulator | Tripura Electricity Regulatory Commission (TERC) |
|---|---|
| State renewable energy agency | Tripura Renewable Energy Development Agency (TREDA) |
| Electricity distribution | TSECL (The whole state of Tripura, including Agartala) |
| Rooftop metering for businesses | Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users |
Solar services in Tripura
- Solar EPC Company in Tripura
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Tripura
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Tripura
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Tripura
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Tripura
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Tripura
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Tripura
Solar output changes across Tripura with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,210 to 1,230 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Agartala | 1,210 | 1,270 |
| Belonia | 1,230 | 1,280 |
| Bisalgarh | 1,210 | 1,270 |
| Bishramganj | 1,210 | 1,270 |
| Dharmanagar | 1,230 | 1,290 |
| Kailashahar | 1,230 | 1,290 |
| Khowai | 1,220 | 1,280 |
| Teliamura | 1,220 | 1,270 |
| Udaipur | 1,220 | 1,270 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Tripura
Questions about solar projects in Tripura
Is net metering available for factories and commercial buildings in Tripura?
In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tripura
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (Tripura Gazette, 5 July 2024), First Amendment Regulations, 2025 (notified 18 December 2025); TERC draft Second Amendment of 16 October 2026
- TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026 (paragraph 1.1.1)
- Tripura Electricity Regulatory Commission
- Tripura Renewable Energy Development Agency (TREDA), a constituent organisation of the Department of Power, Government of Tripura; TREDA notice of 23 April 2025 on PM-KUSUM Component A