Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Tripura. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Tripura at a glance for solar projects
| Electricity regulator | Tripura Electricity Regulatory Commission (TERC) |
|---|---|
| State renewable energy agency | Tripura Renewable Energy Development Agency (TREDA) |
| Electricity distribution | TSECL (The whole state of Tripura, including Agartala) |
| Rooftop metering for businesses | Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Tripura
In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.
- Individual net metering is for 1 kWp to 10 kWp. Net metering at multiple points of one person and group net metering are each for 5 kWp to 500 kWp. Gross metering is for systems above 10 kWp. The system is capped at the contracted load or contract demand of the consumer.
- By voltage, the amended table allows up to 4 kWp on a single-phase LT supply, above 4 kWp to 50 kWp on three-phase LT, above 50 kWp to 2,000 kWp on 11 kV, and above 2,000 kWp to 10,000 kWp on 33 kV.
- The total rooftop capacity on one distribution transformer or feeder may not exceed 60% of its rated capacity.
- A consumer pays monthly for any net import at the retail tariff. For a commercial or industrial consumer, surplus export left at the end of the billing period lapses with no payment, and generation is capped at 3.8 units per kW of approved capacity per day.
- Registered companies, government bodies, educational institutes, firms and individuals who are consumers of the distribution licensee may install a system, with or without battery storage.
- A draft Second Amendment of 16 October 2026 would raise the three-phase LT limit to 150 kWp and the distribution transformer limit to 85%. It is only a draft, and TERC still lists it as one.
What a plant produces in Tripura
Solar output changes across Tripura with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,210 to 1,230 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Agartala | 1,210 | 1,270 |
| Belonia | 1,230 | 1,280 |
| Bisalgarh | 1,210 | 1,270 |
| Bishramganj | 1,210 | 1,270 |
| Dharmanagar | 1,230 | 1,290 |
| Kailashahar | 1,230 | 1,290 |
| Khowai | 1,220 | 1,280 |
| Teliamura | 1,220 | 1,270 |
| Udaipur | 1,220 | 1,270 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Tripura
Is net metering available for factories and commercial buildings in Tripura?
In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tripura
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (Tripura Gazette, 5 July 2024), First Amendment Regulations, 2025 (notified 18 December 2025); TERC draft Second Amendment of 16 October 2026
- TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026 (paragraph 1.1.1)
- Tripura Electricity Regulatory Commission
- Tripura Renewable Energy Development Agency (TREDA), a constituent organisation of the Department of Power, Government of Tripura; TREDA notice of 23 April 2025 on PM-KUSUM Component A