Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Tripura as an EPC contractor: engineering, supply, construction and commissioning.
What Tripura's policy says about large solar plants
TERC's tariff order for 2026-27 says that, under the TERC Open Access Regulations, 2010, consumers with a connected load of 1 MW and above are allowed open access. The order sets the wheeling charge and the cross-subsidy surcharge for 2026-27.
- Wheeling charge for 2026-27: ₹0.47 per unit, applicable to use of TSECL's distribution system by users who are permitted open access at 33 kV.
- Cross-subsidy surcharge for 2026-27 for the Industrial category, above 100 HP: ₹4.51 per unit. The order sets the surcharge at the lower of the computed figure and 20% of the tariff. For Bulk Supply it is ₹1.92 per unit.
- TSECL made no proposal for the surcharge, and the Commission worked it out itself and told TSECL to file a full proposal next time.
Output and land at megawatt scale in Tripura
Solar output changes across Tripura with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,270 to 1,290 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Agartala | 1,210 | 1,270 |
| Belonia | 1,230 | 1,280 |
| Bisalgarh | 1,210 | 1,270 |
| Bishramganj | 1,210 | 1,270 |
| Dharmanagar | 1,230 | 1,290 |
| Kailashahar | 1,230 | 1,290 |
| Khowai | 1,220 | 1,280 |
| Teliamura | 1,220 | 1,270 |
| Udaipur | 1,220 | 1,270 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Tripura
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tripura
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.