Somaya Solar Solutions Limited builds ground-mounted solar power plants in Tripura for businesses that want their own power and for landowners and developers who sell power to the grid.

Output and land for a ground-mounted plant in Tripura

Solar output changes across Tripura with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,270 to 1,290 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Agartala1,2101,270
Belonia1,2301,280
Bisalgarh1,2101,270
Bishramganj1,2101,270
Dharmanagar1,2301,290
Kailashahar1,2301,290
Khowai1,2201,280
Teliamura1,2201,270
Udaipur1,2201,270

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

State policy and open access in Tripura

TERC's tariff order for 2026-27 says that, under the TERC Open Access Regulations, 2010, consumers with a connected load of 1 MW and above are allowed open access. The order sets the wheeling charge and the cross-subsidy surcharge for 2026-27.

  • Wheeling charge for 2026-27: ₹0.47 per unit, applicable to use of TSECL's distribution system by users who are permitted open access at 33 kV.
  • Cross-subsidy surcharge for 2026-27 for the Industrial category, above 100 HP: ₹4.51 per unit. The order sets the surcharge at the lower of the computed figure and 20% of the tariff. For Bulk Supply it is ₹1.92 per unit.
  • TSECL made no proposal for the surcharge, and the Commission worked it out itself and told TSECL to file a full proposal next time.

What a ground-mounted project involves

A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.

  • Land check: title, slope, soil, drainage, access road and shading
  • Distance to the substation or connection point and the line needed to reach it
  • Layout, structure design and foundations for the soil
  • Supply, installation, testing and commissioning
  • Evacuation line, metering and connection approvals
  • Fencing, cleaning water and maintenance planning

More detail: Ground-Mounted Solar Plant across India.

Questions about solar projects in Tripura

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tripura

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.