Somaya Solar Solutions Limited delivers turnkey solar projects in Tripura: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Tripura

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Tripura

In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.

  • Individual net metering is for 1 kWp to 10 kWp. Net metering at multiple points of one person and group net metering are each for 5 kWp to 500 kWp. Gross metering is for systems above 10 kWp. The system is capped at the contracted load or contract demand of the consumer.
  • By voltage, the amended table allows up to 4 kWp on a single-phase LT supply, above 4 kWp to 50 kWp on three-phase LT, above 50 kWp to 2,000 kWp on 11 kV, and above 2,000 kWp to 10,000 kWp on 33 kV.
  • The total rooftop capacity on one distribution transformer or feeder may not exceed 60% of its rated capacity.
  • A consumer pays monthly for any net import at the retail tariff. For a commercial or industrial consumer, surplus export left at the end of the billing period lapses with no payment, and generation is capped at 3.8 units per kW of approved capacity per day.
  • Registered companies, government bodies, educational institutes, firms and individuals who are consumers of the distribution licensee may install a system, with or without battery storage.
  • A draft Second Amendment of 16 October 2026 would raise the three-phase LT limit to 150 kWp and the distribution transformer limit to 85%. It is only a draft, and TERC still lists it as one.

What to expect from the plant in Tripura

Solar output changes across Tripura with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,210 to 1,230 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Agartala1,2101,270
Belonia1,2301,280
Bisalgarh1,2101,270
Bishramganj1,2101,270
Dharmanagar1,2301,290
Kailashahar1,2301,290
Khowai1,2201,280
Teliamura1,2201,270
Udaipur1,2201,270

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Tripura

Is net metering available for factories and commercial buildings in Tripura?

In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tripura

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image