Somaya Solar Solutions Limited builds ground-mounted solar power plants in Mizoram for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Mizoram
Solar output changes across Mizoram with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,350 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Aizawl | 1,280 | 1,340 |
| Hnahthial | 1,290 | 1,340 |
| Khawzawl | 1,300 | 1,350 |
| Kolasib | 1,260 | 1,320 |
| Lawngtlai | 1,300 | 1,350 |
| Lunglei | 1,280 | 1,330 |
| Saiha | 1,290 | 1,340 |
| Saitual | 1,290 | 1,340 |
| Serchhip | 1,290 | 1,350 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Mizoram
The Solar Power Policy of Mizoram, 2025 is the state's current solar policy. The Governor notified it on 25 February 2025 and it stays in force until a new policy replaces it or a further order is made. The State Government decided to review the earlier Solar Power Policy of 2017.
- Target: 275 MW of solar by 2029-30, of which 270 MW is grid-scale solar parks, 4.5 MW rooftop and 0.5 MW solar pumps.
- The Power & Electricity Department is the State Nodal Agency, and ZEDA is the implementing agency for rooftop solar.
- Captive projects are a recognised category. They must follow section 9 of the Electricity Act, 2003 and the rules and orders of the Commission.
- Electricity duty is exempted for captive consumption, sale to the distribution licensee and third-party sale from solar projects set up in the state.
- Banking of energy is allowed for up to one year, with banking charges of 2% in kind. Unredeemed banked energy is treated as bought by the Department at the average pooled power purchase cost set by the Commission.
- Open access and transmission charges follow the Commission's and CERC's regulations. The Commission's green energy open access regulations set the banking charge at 8%, which is not the same as the 2% in the policy.
Under the JERC Open Access Regulations, 2010 that MZERC adopted, open access is allowed for consumers with a connected load of 1 MW and above. The JERC green energy open access charges regulations, also adopted by MZERC, cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
- Banked green energy carries a banking charge of 8% of the energy banked, adjusted in kind. The state's Solar Power Policy of 2025 says 2% for banking, so the two official documents differ.
- The cross-subsidy surcharge for green energy open access may not exceed 20% of the tariff or average billing rate of the consumer category.
- Wheeling charge for 2026-27: ₹1.239 per kWh, set by the tariff order of 25 March 2026. P&ED had asked for ₹1.67.
- No cross-subsidy surcharge or additional surcharge figure for 2026-27 was found in the tariff order.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Mizoram
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mizoram
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026 (Table 9.5); JERC Open Access Regulations, 2010; JERC Green Energy Open Access Charges Regulations, 9 April 2024; both adopted by MZERC on 26 July 2024
- PVGIS, European Commission Joint Research Centre (solar output model)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, Government of Mizoram; Mizoram Gazette Extraordinary, 28 February 2025)