Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Lucknow, Uttar Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Lucknow: industrial areas and district products
The MSME Development Institute's industrial profile of Lucknow district (2013) lists industrial areas at Talkatora, Chinhat, Sarojini Nagar and Amausi.
Under the state's One District One Product scheme, the products listed for Lucknow district are Chikankari and Zari Zardozi.
The Government of India's One District One Product (ODOP) list names Chikankari & Zari Zardozi as the product of Lucknow district.
Metering rules for business rooftops in Lucknow
In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.
The size limits, charges and other conditions for Uttar Pradesh are on the page Commercial & Industrial Solar in Uttar Pradesh.
In Lucknow the application for connection and metering goes to MVVNL.
Output and bill value for a rooftop plant in Lucknow
A solar plant in Lucknow is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.9 lakh |
| 250 kW | 3.5 lakh units | 2,500 sq m | ₹24.7 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹49.3 lakh |
| 1 MW | 13.9 lakh units | 10,000 sq m | ₹98.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Lucknow
These are the Somaya Solar projects closest to Lucknow, with straight-line distances. They are shown as references and are not in Lucknow unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 150 km from Lucknow. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 330 km from Lucknow. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 440 km from Lucknow. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Lucknow
Which electricity company handles solar connections in Lucknow?
Madhyanchal Vidyut Vitran Nigam Limited (MVVNL), the state distribution company with its head office in Lucknow, supplies electricity in Lucknow district. Lucknow is one of the 19 districts MVVNL lists as its area of supply.
Is net metering available for factories and commercial buildings in Lucknow?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Lucknow?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Lucknow?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 400 km from Lucknow in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 150 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Lucknow
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MSME-Development Institute Kanpur (Ministry of MSME, Govt. of India), Brief Industrial Profile of District Lucknow, section 2.1 (PDF created 2013-02-04; figures to 2010-11)
- MVVNL website: About MVVNL (area of supply)
- ODOP portal, Government of Uttar Pradesh: Lucknow district page
- PVGIS, European Commission Joint Research Centre (solar output model)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026