Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Madgaon, Goa. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Madgaon: industrial areas
The Government of Goa lists Margao Industrial Estate among the industrial estates of the Goa Industrial Development Corporation.
The Government of India's One District One Product (ODOP) list names Feni and Cashew Nuts as the products of South Goa district.
Metering rules for business rooftops in Madgaon
In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
The size limits, charges and other conditions for Goa are on the page Commercial & Industrial Solar in Goa.
In Madgaon the application for connection and metering goes to ED Goa.
Output and bill value for a rooftop plant in Madgaon
A solar plant in Madgaon is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹5.60 per kVAh (JERC Tariff Order of 30 September 2025 for the Electricity Department, Government of Goa (Petition No. 141/2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹5.60 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹280 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge from 09:00 to 17:00, 1.2 times from 17:00 to 01:00 and the normal charge from 01:00 to 09:00. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹5.50 per kVAh with a fixed charge of ₹275 per kVA per month. A later JERC order of 6 May 2026 only trued up FY 2024-25 and did not change this tariff. The Electricity Department, Government of Goa is the licensee the order covers.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.60 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹7.6 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹19.0 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹38.1 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹76.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Madgaon
These are the Somaya Solar projects closest to Madgaon, with straight-line distances. They are shown as references and are not in Madgaon unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1530 km from Madgaon. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1630 km from Madgaon. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1690 km from Madgaon. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Madgaon
Which electricity company handles solar connections in Madgaon?
Electricity Department, Government of Goa (ED Goa) supplies Madgaon, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Madgaon?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.
How much electricity does a solar plant generate in Madgaon?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Madgaon?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1530 km from Madgaon in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1530 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Madgaon
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- ED Goa: source naming Madgaon within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- Government of Goa, Department of Information & Publicity (dip.goa.gov.in): Goa Industrial Development Corporation page, list of industrial estates (last modified 10 Nov 2026)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order, Aggregate Revenue Requirement and Determination of Retail Tariff for the 4th MYT Control Period (FY 2025-26 to FY 2029-30), Petition No. 141/2025, Electricity Department, Government of Goa, dated 30 September 2025
- PVGIS, European Commission Joint Research Centre (solar output model)