Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Mahemdavad, Gujarat as an EPC contractor: engineering, supply, construction and commissioning.
What Gujarat's policy says about large solar plants
The Gujarat Integrated Renewable Energy Policy - 2025 is the state's current policy for solar, wind, hybrid and battery storage projects. The Government of Gujarat issued it on 24 December 2025. GERC's distributed renewable energy regulations of October 2026 list it among the rules a rooftop or distributed project must follow.
Under GERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or several in the same electricity division, can buy renewable power through open access. A captive consumer has no minimum load.
The charges, exemptions and conditions for Gujarat are on the page Utility-Scale Solar in Gujarat.
Output and land at megawatt scale in Mahemdavad
A solar plant in Mahemdavad is modelled to produce about 1,460 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (28°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 73.0 lakh units | 20 to 25 acres |
| 10 MW | 1.46 crore units | 40 to 50 acres |
| 25 MW | 3.65 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Mahemdavad
These are the Somaya Solar projects closest to Mahemdavad, with straight-line distances. They are shown as references and are not in Mahemdavad unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 790 km from Mahemdavad. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 880 km from Mahemdavad. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Mahemdavad
Which electricity company handles solar connections in Mahemdavad?
Madhya Gujarat Vij Company Limited (MGVCL) supplies Mahemdavad, which the cited source places in its supply area.
How much electricity does a solar plant generate in Mahemdavad?
About 1,460 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.6 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Mahemdavad?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 800 km from Mahemdavad in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 790 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mahemdavad
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, gazetted 21 February 2024, with amendments to 19 August 2026; GERC tariff order for DGVCL for 2026-27 dated 25 March 2026 (chapter 9); GERC Orders No. 02 of 2026 (17 March 2026) and No. 05 of 2026 (10 September 2026) on additional surcharge
- GeoNames (place coordinates, CC BY 4.0)
- MGVCL: source naming Mahemdavad within its supply area
- MNRE, Policy & Regulatory Updates, December 2025 (section VI, Gujarat); GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 and their Statement of Reasons, 30 October 2026
- PVGIS, European Commission Joint Research Centre (solar output model)